Difference between revisions of "Beam Text May 17 2012"
Jump to navigation
Jump to search
Line 28: | Line 28: | ||
3) Camera in? | 3) Camera in? | ||
+ | |||
+ | = Energy Scan at 10 MeV = | ||
+ | |||
+ | |||
+ | {| border="1" | ||
+ | | Energy Switch || Out (High En Range) | ||
+ | |- | ||
+ | | Dipole Coil Current || 33 | ||
+ | |- | ||
+ | | e- Beam Energy () || 15.6004336 MeV (mapping ) | ||
+ | |- | ||
+ | | Solenoid 1 || A | ||
+ | |- | ||
+ | | Solenoid 2 || A | ||
+ | |- | ||
+ | | Gun Hor || 0 A | ||
+ | |- | ||
+ | | Gun Ver ||0 A | ||
+ | |- | ||
+ | |Output Hor || 0.4 A | ||
+ | |- | ||
+ | | Output Ver ||0.3 A | ||
+ | |- | ||
+ | | Rep Rate || 6 | ||
+ | |- | ||
+ | | Gun HV || 8.99(Knob Setting) | ||
+ | |- | ||
+ | | Gun Grid Voltage || 10 (Knob Setting) | ||
+ | |- | ||
+ | | RF frequency ||2856.291 MHz | ||
+ | |- | ||
+ | | Modulator HV Power Supply || 4.84 (Knob Setting) | ||
+ | |- | ||
+ | | RF macro Pulse Length (FWHM) || 300 ns | ||
+ | |- | ||
+ | |Q1 (A)|| 0 | ||
+ | |- | ||
+ | |Q2 (A)|| 0 | ||
+ | |- | ||
+ | |Q3 (A)|| 0 | ||
+ | |- | ||
+ | |Q4 (A)|| 0 | ||
+ | |- | ||
+ | |Q5 (A)|| 0 | ||
+ | |- | ||
+ | |Q6 (A)|| 0 | ||
+ | |- | ||
+ | | Peak Current on FC 1 (45 deg) || 88.8 mAmps | ||
+ | |- | ||
+ | | Peak Current on FC 2 (45 deg) || 26.4 mAmps | ||
+ | |- | ||
+ | | Scope on FC 1 || [[File:hrrl_26Apr2012_EnTest_4MeV_FC1_cur.png | 200 px]] | ||
+ | |- | ||
+ | | Scope on FC 2 || [[File:hrrl_26Apr2012_EnTest_4MeV_FC2_cur.png | 200 px]] | ||
+ | |- | ||
+ | |- | ||
+ | | Beam Spot || [[File:hrrl_26Apr2012_EnTest_15MeV_beam_im.png | 200 px]] | ||
+ | |} |
Revision as of 04:01, 17 May 2012
Preparation
0. MATLAB emittance analysis: (working?) -- yes
1. Magnets: --Working
2. Camera: (a)--Working, (b)--shielding-good,(c) Sync? -- good
3. Flags: --Working
4. Farady Cup: hocked up? --yes
5. Blank off for camera on? --good
6. Gas bottle for valve full? --Yes
7. Gas bottle for flags full? --Yes
8. 3 Pickup Coils (Green Torroids): (1)@gun: hocked-up; (2)@accelerator exit: hocked-up to 2 red strip wire. Now connected to linac monitor panel which labeled as "J12 from back", "Scan field Mon" from front. (3)@end of beamline:
Check List Before Start
1) Valve exit of cavity opened?
2) Faraday cups are hocked up?
3) Camera in?
Energy Scan at 10 MeV
Energy Switch | Out (High En Range) |
Dipole Coil Current | 33 |
e- Beam Energy () | 15.6004336 MeV (mapping ) |
Solenoid 1 | A |
Solenoid 2 | A |
Gun Hor | 0 A |
Gun Ver | 0 A |
Output Hor | 0.4 A |
Output Ver | 0.3 A |
Rep Rate | 6 |
Gun HV | 8.99(Knob Setting) |
Gun Grid Voltage | 10 (Knob Setting) |
RF frequency | 2856.291 MHz |
Modulator HV Power Supply | 4.84 (Knob Setting) |
RF macro Pulse Length (FWHM) | 300 ns |
Q1 (A) | 0 |
Q2 (A) | 0 |
Q3 (A) | 0 |
Q4 (A) | 0 |
Q5 (A) | 0 |
Q6 (A) | 0 |
Peak Current on FC 1 (45 deg) | 88.8 mAmps |
Peak Current on FC 2 (45 deg) | 26.4 mAmps |
Scope on FC 1 | 200 px |
Scope on FC 2 | 200 px |
Beam Spot | 200 px |