Difference between revisions of "Beam Text May 17 2012"

From New IAC Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
[[https://wiki.iac.isu.edu/index.php?title=HRRL_Experiment_Readiness_Chek_List&action=edit Check List]]
 
[[https://wiki.iac.isu.edu/index.php?title=HRRL_Experiment_Readiness_Chek_List&action=edit Check List]]
  
0. MATLAB emittance analysis: (working?)
+
0. MATLAB emittance analysis: (working?) -- yes
  
 
1. Magnets: --Working
 
1. Magnets: --Working
  
2. Camera: (a)--Working, (b)--shielding-good,(c) Sync?
+
2. Camera: (a)--Working, (b)--shielding-good,(c) Sync? -- good
  
 
3. Flags: --Working
 
3. Flags: --Working
  
4. Farady Cup: hocked up?
+
4. Farady Cup: hocked up? --yes
  
5. Blank off for camera on?
+
5. Blank off for camera on? --good
  
 
6. Gas bottle for valve full? --Yes
 
6. Gas bottle for valve full? --Yes

Revision as of 03:53, 17 May 2012

Preparation

[Check List]

0. MATLAB emittance analysis: (working?) -- yes

1. Magnets: --Working

2. Camera: (a)--Working, (b)--shielding-good,(c) Sync? -- good

3. Flags: --Working

4. Farady Cup: hocked up? --yes

5. Blank off for camera on? --good

6. Gas bottle for valve full? --Yes

7. Gas bottle for flags full? --Yes

8. 3 Pickup Coils (Green Torroids): (1)@gun: hocked-up; (2)@accelerator exit: hocked-up to 2 red strip wire. Now connected to linac monitor panel which labeled as "J12 from back", "Scan field Mon" from front. (3)@end of beamline: