Difference between revisions of "Beam Text May 17 2012"

From New IAC Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
0. MATLAB emittance analysis: (working?)
 
0. MATLAB emittance analysis: (working?)
  
1. Magnets: (Working)
+
1. Magnets: --Working
  
2. Camera: (a)Working, (b)shielding-good,(c) Sync?
+
2. Camera: (a)--Working, (b)--shielding-good,(c) Sync?
  
3. Flags: (Working)
+
3. Flags: --Working
  
 
4. Farady Cup: hocked up?
 
4. Farady Cup: hocked up?
Line 17: Line 17:
 
6. Gas bottle for valve full? --Yes
 
6. Gas bottle for valve full? --Yes
  
7. Gas bottle for flags full? --Yes
+
7. Gas bottle for flags full? --Yes
  
 
8. 3 Pickup Coils (Green Torroid) (@gun, @accelerator exit, @end of beamline): hocked up?
 
8. 3 Pickup Coils (Green Torroid) (@gun, @accelerator exit, @end of beamline): hocked up?

Revision as of 03:53, 15 May 2012

Preparation

[Check List]

0. MATLAB emittance analysis: (working?)

1. Magnets: --Working

2. Camera: (a)--Working, (b)--shielding-good,(c) Sync?

3. Flags: --Working

4. Farady Cup: hocked up?

5. Blank off for camera on?

6. Gas bottle for valve full? --Yes

7. Gas bottle for flags full? --Yes

8. 3 Pickup Coils (Green Torroid) (@gun, @accelerator exit, @end of beamline): hocked up?