Difference between revisions of "201111 R1ProgressRep"

From New IAC Wiki
Jump to navigation Jump to search
Line 22: Line 22:
  
 
All field wires are strung on SL2.
 
All field wires are strung on SL2.
 +
 +
[[file:20111104_Wires.png | 400 px]]
  
 
[[file:20111104_Temp2.png | 400 px]]
 
[[file:20111104_Temp2.png | 400 px]]

Revision as of 21:46, 4 November 2011

11/1/11

70 wires were strung today. Our second stringer should be starting tomorrow.

11/2/11

91 wires were strung today.

20111102 Temp1.png

11/3/11

The correct HVAC filters came in today. A clean filter was installed today at ~10 AM. A small rise in temperature can be seen in the temperature graph when this change was made.

77 wires were strung today.

20111103 Temp1.png

11/4/11

91 wires were strung today.

All field wires are strung on SL2.

20111104 Wires.png

20111104 Temp2.png