Difference between revisions of "September 19, 2011"
Jump to navigation
Jump to search
Line 37: | Line 37: | ||
|align="left"|Beam check-in run. Beam lost. | |align="left"|Beam check-in run. Beam lost. | ||
R(beam down) n/pulse <br> | R(beam down) n/pulse <br> | ||
− | R(upstream) | + | R(upstream) e+/pulse<br> |
|- | |- | ||
|} | |} | ||
Line 71: | Line 71: | ||
R(upstream) = 0.01198 = e+/pulse<br> | R(upstream) = 0.01198 = e+/pulse<br> | ||
|- | |- | ||
− | |<span style="color:red">'''2492'''</span>||Up<br> 90A||In ||Open ||Yes || | + | |<span style="color:red">'''2492'''</span>||Up<br> 90A||In ||Open ||Yes ||Out||DU cylinder |
|align="left"|Beam check-in run. | |align="left"|Beam check-in run. | ||
R(beam down) = 0 n/pulse <br> | R(beam down) = 0 n/pulse <br> |
Revision as of 23:57, 19 September 2011
Summary of the day
- current 120 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
Run # | Beam | Dump magnet | Collimator | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2479 | Up 90A |
In | Open | Yes | In | DU cylinder | Beam check-in run. Additional collimator in
R(beam down) = 0.000689 n/pulse |
2480 | Up 90A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0.000018 n/pulse |
2482 | Down 86A |
In | Open | Yes | In | DU cylinder | Beam check-in run.
R(beam down) = 0.000717 n/pulse |
2483 | Down 86A |
In | Open | Yes | Out | DU cylinder | Beam check-in run. Beam lost.
R(beam down) n/pulse |
- current 160 mA
- rep rate 180 Hz
Run # | Beam | Dump magnet | Collimator | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2488 | Down 86A |
In | Open | Yes | Out | DU cylinder | Beam returned without VS. Beam check-in run. Additional collimator in
R(beam down) = 0 n/pulse |
2489 | Down 86A |
In | Open | Yes | In | DU cylinder | Beam check-in run.
R(beam down) = 0.00057 n/pulse |
2490 | Up 90A |
In | Open | Yes | In | DU cylinder | Beam off. |
2491 | Up 90A |
In | Open | Yes | In | DU cylinder | Beam check-in run.
R(beam down) = 0.000569 n/pulse |
2492 | Up 90A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0 n/pulse |