Difference between revisions of "September 16, 2011"
| Line 75: | Line 75: | ||
| |- | |- | ||
| + | |} | ||
| + | |||
| + | |||
| + | {| border="1" cellspacing="0" style="text-align: center; width: 1000px " | ||
| + | ! scope="col" width="7.2%" | Run # | ||
| + | ! scope="col" width="7.2%" | Beam | ||
| + | ! scope="col" width="7.2%" | Dump magnet | ||
| + | ! scope="col" width="7.2%" | Collimator | ||
| + | ! scope="col" width="7.2%" | Hardener | ||
| + | ! scope="col" width="7.2%" | Radiator 25 um Al | ||
| + | ! scope="col" width="7.2%" | Target | ||
| + | ! scope="col" width="56.6%" | Comments | ||
| + | |- | ||
| + | |<span style="color:red">'''2459'''</span>||Up<br> 90A||In ||Open ||Yes ||Up||DU cylinder  | ||
| + | |align="left"|Beam check-in run. | ||
| + | R(beam down) =  n/pulse  <br> | ||
| + | R(upstream) =  = e+/pulse<br> | ||
| + | <span style="color:red"> </span> | ||
| + | |- | ||
| |} | |} | ||
| + | |||
| [https://wiki.iac.isu.edu/index.php/September_16,_2011#summary_what_was_been_done go up] | [https://wiki.iac.isu.edu/index.php/September_16,_2011#summary_what_was_been_done go up] | ||
Revision as of 22:25, 16 September 2011
summary what was been done
| Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 10 um Al | Target | Comments | 
|---|---|---|---|---|---|---|---|
| 2459 | Up 90A | In | Open | Yes | Out | DU cylinder | Beam check-in run. R(beam down) = 1/160279 = 0.0000062 n/pulse   | 
| 2460 | Down 86A | In | Open | Yes | Out | DU cylinder | Beam check-in run. R(beam down) = 0/160873 = 0 n/pulse  | 
| 2461 | Down 86A | In | Open | Yes | Down | DU cylinder | Beam check-in run. R(beam down) = 33/160084 = 0.0002061 n/pulse  -> ×180×60 = 2.2 n/min | 
| 2462 | Up 90A | In | Open | Yes | Up | DU cylinder | Beam check-in run. R(beam down) = 0.000362 n/pulse   -> ×180×60 = 3.9 n/min | 
| 2463 | Up 90A | In | Open | Yes | Up | Out | Beam check-in run. R(beam down) = 0 n/pulse  | 
| 2464 | Down 86A | In | Open | Yes | Down | Out | Beam check-in run. Short beam off R(beam down) = 0.000029 n/pulse  | 
| 2465 | Down 86A | In | Open | Yes | Down | Out | Beam check-in run. Redoing 2464 R(beam down) = 3/160876 = 0.000019 n/pulse  | 
| 2466 | Down 86A | In | Open | Yes | Down | DU cylinder | Long production run R(beam down) = 243/972019 = 0.00025 n/pulse  -> ×180×60 = 2.7 n/min | 
| 2467 | Up 90A | In | Open | Yes | Up | DU cylinder | Long production run R(beam down) = 292/972017 = 0.0003 n/pulse  -> ×180×60 =  3.2 n/min | 
| 2468 | Up 90A | In | Open | Yes | Out | DU cylinder | Long production run R(beam down) = 0/162265 = 0 n/pulse  | 
| 2469 | Up 90A | In | Open | Yes | Out | DU cylinder | Long production run. Bean was turned up a little by operator's view screen. R(beam down) =  n/pulse  | 
| Removed dump magnet and recalibrated beam | |||||||
| Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 25 um Al | Target | Comments | 
|---|---|---|---|---|---|---|---|
| 2459 | Up 90A | In | Open | Yes | Up | DU cylinder | Beam check-in run. R(beam down) =  n/pulse   |