Difference between revisions of "September 15, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 2: Line 2:
  
  
The view flag was lost. So the vacuum was broken. During that time:
+
The view flag was lost. So the vacuum was broken to fix it. During that time:
 
* the radiator was reinstalled and recallibrated so we have now both 10um and 25 um of Al radiator.  
 
* the radiator was reinstalled and recallibrated so we have now both 10um and 25 um of Al radiator.  
 
* The collimation system and target was more precisely realign.  
 
* The collimation system and target was more precisely realign.  

Revision as of 17:04, 16 September 2011

go back


The view flag was lost. So the vacuum was broken to fix it. During that time:

  • the radiator was reinstalled and recallibrated so we have now both 10um and 25 um of Al radiator.
  • The collimation system and target was more precisely realign.
  • The to left and right side 90 detectors was realign so now they are at the same level
  • the measurements of upstream and downstream geometry was made.


Radiator calibration

From the top start to count. The 25 um Al radiator will come first after 28 CCW turns and 10 um Al radiator will come second after 67 CCW turns.

Radiator calibration 9.15.11.png

Upstream geometry measurements

Upsream geometry measurements 9.15.11.png

Downstream geometry measurements

go up