Difference between revisions of "September 13, 2011"
(One intermediate revision by the same user not shown) | |||
Line 101: | Line 101: | ||
|align="left"|Same as 2407 but additional shielding removed to improve background countime rate | |align="left"|Same as 2407 but additional shielding removed to improve background countime rate | ||
|- | |- | ||
− | |2409||Up 2 mm||In ||Open ||1" Al ||2 mm | + | |2409||Up 2 mm||In ||Open ||1" Al ||Up 2 mm ||DU plate |
|align="left"| | |align="left"| | ||
|- | |- | ||
− | |2410||Up 2 mm||In ||Open ||1" Al ||2 mm | + | |2410||Up 2 mm||In ||Open ||1" Al ||Up 2 mm ||DU plate |
|align="left"|Beam tuned up a bit, new camera was installed | |align="left"|Beam tuned up a bit, new camera was installed | ||
|- | |- | ||
Line 130: | Line 130: | ||
|} | |} | ||
+ | |||
+ | |||
+ | |||
+ | [https://wiki.iac.isu.edu/index.php/September_13,_2011 go up] |
Latest revision as of 16:57, 16 September 2011
summary what was been done
Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2385 | Up 2 mm | In | Open | No | Out | DU plate | Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse |
2386 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam check-in run. 1" of Al hardener in front of upstream radiator.
R(beam 45 left) = n/pulse |
2387 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Lost beam |
2388 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation
R(beam 45 left) = n/pulse |
2389-2395 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Detectors set-up. Two of them are non-working. |
2396 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test
R(beam 45 left) = 104/216929 = 0.000479 n/pulse |
2397 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Radiator in/out test
R(beam 45 left) = 9/200289 = 0.0000449 n/pulse |
2398 | Down 2 mm | In | Open | 1" Al | Down 2 mm | DU plate | Radiator in/out test
R(beam 45 left) = n/pulse |
2399 | Down 2 mm | In | Open | 1" Al | Out | DU plate | Radiator in/out test
R(beam 45 left) = n/pulse |
2400 | Up 2 mm | In | Open | 1" Al | Out | No | |
2401 | Up 2 mm | In | Open | 1" Al | Out | DU plate | |
2402 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Oleksiy moved radiator in |
2403 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Jason moved radiator in. Same results. |
2404 | Center | In | Open | 1" Al | In | DU plate | |
2405 | Center | In | Open | 1" Al | In | DU plate | DU plate was repositioned. Now beam should hit small part of the target corner. |
2406 | Center | In | Open | 1" Al | In | DU plate | Same as 2405 |
2407 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Additional shielding added around the core part of the beam pipe (downstream the radiator) |
2408 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Same as 2407 but additional shielding removed to improve background countime rate |
2409 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | |
2410 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam tuned up a bit, new camera was installed |
2411 | Up 2 mm | In | Open | 1" Al | Out | DU plate | |
2412 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Put additional shielding around conical part of the beam pipe. |
2413 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 300 |
2414 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 200 |
2415 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 100 |
2416 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 60 |
2417 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 60. Anode voltage is lowered from 3.9 to 3.0 arb. units |