<span style="color:red">Lost beam</span> | <span style="color:red">Lost beam</span> | ||
|- | |- | ||
|2386||Up 2 mm||In ||Open ||1" Al | |2386||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
|align="left"|Beam check-in run. 1" of Al hardener in front of upstream radiator. | |align="left"|Beam check-in run. '''1" of Al hardener in front of upstream radiator.''' | ||
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> | ||
R(beam 45 right) = n/pulse<br> | R(beam 45 right) = n/pulse<br> | ||
| Line 30: | Line 30: | ||
<span style="color:red">About 92% of neutrons are coming from the radiator according to n detector down. Good</span> | <span style="color:red">About 92% of neutrons are coming from the radiator according to n detector down. Good</span> | ||
|- | |- | ||
|2387||Up 2 mm||In ||Open || | |2387||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
|align="left"|<span style="color:red">Lost beam</span> | |align="left"|<span style="color:red">Lost beam</span> | ||
|- | |- | ||
|2388||Up 2 mm||In ||Open || | |2388||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
|align="left"|Beam check-in run | |align="left"|Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation | ||
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> | ||
R(beam 45 right) = n/pulse<br> | R(beam 45 right) = n/pulse<br> | ||
| Line 41: | Line 41: | ||
<span style="color:red">About % of photons are coming from the radiator according to PS. Bad</span><br> | <span style="color:red">About % of photons are coming from the radiator according to PS. Bad</span><br> | ||
|- | |- | ||
|2389-2395||Up 2 mm||In ||Open || | |2389-2395||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
|align="left"|Detectors set-up. Two of them are non-working. | |align="left"|Detectors set-up. Two of them are non-working. | ||
|- | |- | ||
|2396||Up 2 mm||In ||Open ||Up 2 mm||DU plate | |2396||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
|align="left"|HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test | |align="left"|HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test | ||
R(beam 45 left) = 104/216929 = 0.000479 n/pulse <br> | R(beam 45 left) = 104/216929 = 0.000479 n/pulse <br> | ||
| Line 51: | Line 51: | ||
R(upstream) = 4787/216929 = 0.02207 e+/pulse<br> | R(upstream) = 4787/216929 = 0.02207 e+/pulse<br> | ||
|- | |- | ||
|2397||Up 2 mm||In ||Open || | |2397||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"|Radiator in/out test | |align="left"|Radiator in/out test | ||
R(beam 45 left) = 9/200289 = 0.0000449 n/pulse <br> | R(beam 45 left) = 9/200289 = 0.0000449 n/pulse <br> | ||
| Line 59: | Line 59: | ||
<span style="color:red">About 75% of photons are coming from the radiator according to PS</span><br> | <span style="color:red">About 75% of photons are coming from the radiator according to PS</span><br> | ||
|- | |- | ||
|2398||Down 2 mm||In ||Open || | |2398||Down 2 mm||In ||Open ||1" Al ||Down 2 mm||DU plate | ||
|align="left"|Radiator in/out test | |align="left"|Radiator in/out test | ||
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> | ||
| Line 66: | Line 66: | ||
R(upstream) = e+/pulse<br> | R(upstream) = e+/pulse<br> | ||
|- | |- | ||
|2399||Down 2 mm||In ||Open || | |2399||Down 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"|Radiator in/out test | |align="left"|Radiator in/out test | ||
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> | ||
| Line 74: | Line 74: | ||
<span style="color:red">About % of photons are coming from the radiator according to PS.</span><br> | <span style="color:red">About % of photons are coming from the radiator according to PS.</span><br> | ||
|- | |- | ||
|2400||Up 2 mm||In ||Open || | |2400||Up 2 mm||In ||Open ||1" Al ||Out||No | ||
|align="left"| | |align="left"| | ||
|- | |- | ||
|2401||Up 2 mm||In ||Open || | |2401||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"| | |align="left"| | ||
|- | |- | ||
|2402||Up 2 mm||In ||Open || | |2402||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
|align="left"|Oleksiy moved radiator in | |align="left"|Oleksiy moved radiator in | ||
|- | |- | ||
|2403||Up 2 mm||In ||Open || | |2403||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate | ||
|align="left"|Jason moved radiator in. Same results. | |align="left"|Jason moved radiator in. Same results. | ||
|- | |- | ||
|2404||Center||In ||Open || | |2404||Center||In ||Open ||1" Al ||In||DU plate | ||
|align="left"| | |align="left"| | ||
|- | |- | ||
|2405||Center||In ||Open || | |2405||Center||In ||Open ||1" Al ||In||DU plate | ||
|align="left"|DU plate was repositioned. Now beam should hit small part of the target corner. | |align="left"|DU plate was repositioned. Now beam should hit small part of the target corner. | ||
|- | |- | ||
|2406||Center||In ||Open || | |2406||Center||In ||Open ||1" Al ||In||DU plate | ||
|align="left"|Same as 2405 | |align="left"|Same as 2405 | ||
|- | |- | ||
|2407||Up 2 mm||In ||Open || | |2407||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"|Additional shielding added around the core part of the beam pipe (downstream the radiator) | |align="left"|Additional shielding added around the core part of the beam pipe (downstream the radiator) | ||
|- | |- | ||
|2408||Up 2 mm||In ||Open || | |2408||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"|Same as 2407 but additional shielding removed to improve background countime rate | |align="left"|Same as 2407 but additional shielding removed to improve background countime rate | ||
|- | |- | ||
|2409||Up 2 mm||In ||Open || | |2409||Up 2 mm||In ||Open ||1" Al ||Up 2 mm ||DU plate | ||
|align="left"| | |align="left"| | ||
|- | |- | ||
|2410||Up 2 mm||In ||Open || | |2410||Up 2 mm||In ||Open ||1" Al ||Up 2 mm ||DU plate | ||
|align="left"|Beam tuned up a bit, new camera was installed | |align="left"|Beam tuned up a bit, new camera was installed | ||
|- | |- | ||
|2411||Up 2 mm||In ||Open || | |2411||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"| | |align="left"| | ||
|- | |- | ||
|2412||Up 2 mm||In ||Open || | |2412||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"| Put additional shielding around conical part of the beam pipe. | |align="left"| Put additional shielding around conical part of the beam pipe. | ||
|- | |- | ||
|2413||Up 2 mm||In ||Open || | |2413||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"| same as 2412. slits @ 300 | |align="left"| same as 2412. slits @ 300 | ||
|- | |- | ||
|2414||Up 2 mm||In ||Open || | |2414||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"| same as 2412. slits @ 200 | |align="left"| same as 2412. slits @ 200 | ||
|- | |- | ||
|2415||Up 2 mm||In ||Open || | |2415||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"| same as 2412. slits @ 100 | |align="left"| same as 2412. slits @ 100 | ||
|- | |- | ||
|2416||Up 2 mm||In ||Open || | |2416||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"| same as 2412. slits @ 60 | |align="left"| same as 2412. slits @ 60 | ||
|- | |- | ||
|2417||Up 2 mm||In ||Open || | |2417||Up 2 mm||In ||Open ||1" Al ||Out||DU plate | ||
|align="left"| same as 2412. slits @ 60. Anode voltage is lowered from 3.9 to 3.0 arb. units | |align="left"| same as 2412. slits @ 60. Anode voltage is lowered from 3.9 to 3.0 arb. units | ||
|- | |- | ||
|} | |} | ||
[https://wiki.iac.isu.edu/index.php/September_13,_2011 go up] | |||
Latest revision as of 16:57, 16 September 2011
summary what was been done
| Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 10 um Al | Target | Comments |
|---|---|---|---|---|---|---|---|
| 2385 | Up 2 mm | In | Open | No | Out | DU plate | Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse |
| 2386 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam check-in run. 1" of Al hardener in front of upstream radiator.
R(beam 45 left) = n/pulse |
| 2387 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Lost beam |
| 2388 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation
R(beam 45 left) = n/pulse |
| 2389-2395 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Detectors set-up. Two of them are non-working. |
| 2396 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test
R(beam 45 left) = 104/216929 = 0.000479 n/pulse |
| 2397 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Radiator in/out test
R(beam 45 left) = 9/200289 = 0.0000449 n/pulse |
| 2398 | Down 2 mm | In | Open | 1" Al | Down 2 mm | DU plate | Radiator in/out test
R(beam 45 left) = n/pulse |
| 2399 | Down 2 mm | In | Open | 1" Al | Out | DU plate | Radiator in/out test
R(beam 45 left) = n/pulse |
| 2400 | Up 2 mm | In | Open | 1" Al | Out | No | |
| 2401 | Up 2 mm | In | Open | 1" Al | Out | DU plate | |
| 2402 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Oleksiy moved radiator in |
| 2403 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Jason moved radiator in. Same results. |
| 2404 | Center | In | Open | 1" Al | In | DU plate | |
| 2405 | Center | In | Open | 1" Al | In | DU plate | DU plate was repositioned. Now beam should hit small part of the target corner. |
| 2406 | Center | In | Open | 1" Al | In | DU plate | Same as 2405 |
| 2407 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Additional shielding added around the core part of the beam pipe (downstream the radiator) |
| 2408 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Same as 2407 but additional shielding removed to improve background countime rate |
| 2409 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | |
| 2410 | Up 2 mm | In | Open | 1" Al | Up 2 mm | DU plate | Beam tuned up a bit, new camera was installed |
| 2411 | Up 2 mm | In | Open | 1" Al | Out | DU plate | |
| 2412 | Up 2 mm | In | Open | 1" Al | Out | DU plate | Put additional shielding around conical part of the beam pipe. |
| 2413 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 300 |
| 2414 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 200 |
| 2415 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 100 |
| 2416 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 60 |
| 2417 | Up 2 mm | In | Open | 1" Al | Out | DU plate | same as 2412. slits @ 60. Anode voltage is lowered from 3.9 to 3.0 arb. units |