Difference between revisions of "September 15, 2011"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
==Radiator calibration== | ==Radiator calibration== | ||
− | [File:Radiator calibration 9.15.11.png ] | + | [[File:Radiator calibration 9.15.11.png | 800px]] |
Revision as of 15:09, 16 September 2011
The view flag was lost. So the vacuum was broken. During that time:
- the radiator was reinstalled so we have now both 10um and 25 um of Al radiator.
- radiator was recalibrated
- The collimation system and target was more precisely realign.
- The to left and right side 90 detectors was realign so now they are at the same level