The view flag was lost. So the vacuum was broken. During that time:
 +
* the radiator was reinstalled so we have now both 10um and 25 um of Al radiator.
 +
* radiator was recalibrated
 +
* The collimation system and target was more precisely realign.
 +
* The to left and right side 90 detectors was realign so now they are at the same level
 +
 +
 +
==Radiator calibration==
 +
 +
from the top:

Revision as of 14:54, 16 September 2011

go back


The view flag was lost. So the vacuum was broken. During that time:

  • the radiator was reinstalled so we have now both 10um and 25 um of Al radiator.
  • radiator was recalibrated
  • The collimation system and target was more precisely realign.
  • The to left and right side 90 detectors was realign so now they are at the same level