Difference between revisions of "September 16, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 12: Line 12:
 
! scope="col" width="100%" | Comments
 
! scope="col" width="100%" | Comments
 
|-
 
|-
|2418||Up 90A||In ||Open ||Yes ||Out||DU cylinder  
+
|2459||Up 90A||In ||Open ||Yes ||Out||DU cylinder  
 
|align="left"|Beam check-in run.
 
|align="left"|Beam check-in run.
R(beam down) = 69/53880 = 0.0013 n/pulse<br>
+
R(beam down) = 1/160279 = 0.0000062 n/pulse<br>
R(upstream) = 0.0143 = e+/pulse<br>
+
R(upstream) = 124/160279 = 0.00077 = e+/pulse<br>
 
<span style="color:red"> </span>
 
<span style="color:red"> </span>
 
|-
 
|-

Revision as of 14:46, 16 September 2011

go back

summary what was been done

Run # Beam Dump magnet Collimator Hardener Radiator 10 um Al Target Comments
2459 Up 90A In Open Yes Out DU cylinder Beam check-in run.

R(beam down) = 1/160279 = 0.0000062 n/pulse
R(upstream) = 124/160279 = 0.00077 = e+/pulse


go back