Difference between revisions of "September 14, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 12: Line 12:
 
! scope="col" width="100%" | Comments
 
! scope="col" width="100%" | Comments
 
|-
 
|-
|2385||Up 2 mm||In ||Open ||No ||Out||DU plate  
+
|2418||Up 2 mm||In ||Open ||Yes ||Out||DU plate  
|align="left"|Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.
+
|align="left"|Beam check-in run. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.
 
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse <br>
 
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse <br>
 
R(beam 45 right) = 0/583758 = 0.0 n/pulse<br>
 
R(beam 45 right) = 0/583758 = 0.0 n/pulse<br>
Line 19: Line 19:
 
R(upstream) =  1374/173553 = 0.00792 e+/pulse<br>
 
R(upstream) =  1374/173553 = 0.00792 e+/pulse<br>
 
<span style="color:red">Lost beam</span>
 
<span style="color:red">Lost beam</span>
|-
 
|2386||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate
 
|align="left"|Beam check-in run. '''1" of Al hardener in front of upstream radiator.'''
 
R(beam 45 left) =  n/pulse <br>
 
R(beam 45 right) =  n/pulse<br>
 
R(beam down) = 90/79367 = 0.0011340 n/pulse<br>
 
R(upstream) =  1058/57841 = 0.01829 e+/pulse<br>
 
<span style="color:red">About 57% of photons are coming from the radiator according to PS. Bad</span><br>
 
<span style="color:red">About 92% of neutrons are coming from the radiator according to n detector down. Good</span>
 
|-
 
|2387||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate
 
|align="left"|<span style="color:red">Lost beam</span>
 
|-
 
|2388||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate
 
|align="left"|Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation
 
R(beam 45 left) =  n/pulse <br>
 
R(beam 45 right) =  n/pulse<br>
 
R(beam down) =  n/pulse<br>
 
R(upstream) =  e+/pulse<br>
 
<span style="color:red">About % of photons are coming from the radiator according to PS. Bad</span><br>
 
|-
 
|2389-2395||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate
 
|align="left"|Detectors set-up. Two of them are non-working.
 
|-
 
|2396||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate
 
|align="left"|HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test
 
R(beam 45 left) =  104/216929 = 0.000479 n/pulse <br>
 
R(beam 45 right) =  62/216929 = 0.000286 n/pulse<br>
 
R(beam down) =  300/216929 = 0.001383 n/pulse<br>
 
R(upstream) =  4787/216929 = 0.02207 e+/pulse<br>
 
|-
 
|2397||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"|Radiator in/out test
 
R(beam 45 left) = 9/200289 = 0.0000449 n/pulse <br>
 
R(beam 45 right) =  8/200289 = 0.0000399 n/pulse<br>
 
R(beam down) = 19/200289 = 0.0000949 n/pulse<br>
 
R(upstream) =  1113/200289 = 0.00556 e+/pulse<br>
 
<span style="color:red">About 75% of photons are coming from the radiator according to PS</span><br>
 
|-
 
|2398||Down 2 mm||In ||Open ||1" Al ||Down 2 mm||DU plate
 
|align="left"|Radiator in/out test
 
R(beam 45 left) =  n/pulse <br>
 
R(beam 45 right) =  n/pulse<br>
 
R(beam down) =  n/pulse<br>
 
R(upstream) =  e+/pulse<br>
 
|-
 
|2399||Down 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"|Radiator in/out test
 
R(beam 45 left) =  n/pulse <br>
 
R(beam 45 right) =  n/pulse<br>
 
R(beam down) =  n/pulse<br>
 
R(upstream) =  e+/pulse<br>
 
<span style="color:red">About % of photons are coming from the radiator according to PS.</span><br>
 
|-
 
|2400||Up 2 mm||In ||Open ||1" Al ||Out||No
 
|align="left"|
 
|-
 
|2401||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"|
 
|-
 
|2402||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate
 
|align="left"|Oleksiy moved radiator in
 
|-
 
|2403||Up 2 mm||In ||Open ||1" Al ||Up 2 mm||DU plate
 
|align="left"|Jason moved radiator in. Same results.
 
|-
 
|2404||Center||In ||Open ||1" Al ||In||DU plate
 
|align="left"|
 
|-
 
|2405||Center||In ||Open ||1" Al ||In||DU plate
 
|align="left"|DU plate was repositioned. Now beam should hit small part of the target corner.
 
|-
 
|2406||Center||In ||Open ||1" Al ||In||DU plate
 
|align="left"|Same as 2405
 
|-
 
|2407||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"|Additional shielding added around the core part of the beam pipe (downstream the radiator)
 
|-
 
|2408||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"|Same as 2407 but additional shielding removed to improve background countime rate
 
|-
 
|2409||Up 2 mm||In ||Open ||1" Al ||Up 2 mm ||DU plate
 
|align="left"|
 
|-
 
|2410||Up 2 mm||In ||Open ||1" Al ||Up 2 mm ||DU plate
 
|align="left"|Beam tuned up a bit, new camera was installed
 
|-
 
|2411||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"|
 
|-
 
|2412||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"| Put additional shielding around conical part of the beam pipe.
 
|-
 
|2413||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"| same as 2412. slits @ 300
 
|-
 
|2414||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"| same as 2412. slits @ 200
 
|-
 
|2415||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"| same as 2412. slits @ 100
 
|-
 
|2416||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"| same as 2412. slits @ 60
 
|-
 
|2417||Up 2 mm||In ||Open ||1" Al ||Out||DU plate
 
|align="left"| same as 2412. slits @ 60. Anode voltage is lowered from 3.9 to 3.0 arb. units
 
 
|-
 
|-
  

Revision as of 15:05, 14 September 2011

go back

summary what was been done

Run # Beam Dump magnet Collimator Hardener Radiator 10 um Al Target Comments
2418 Up 2 mm In Open Yes Out DU plate Beam check-in run. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.

R(beam 45 left) = 6/173553 = 0.0000346 n/pulse
R(beam 45 right) = 0/583758 = 0.0 n/pulse
R(beam down) = 15/173553 = 0.0000864 n/pulse
R(upstream) = 1374/173553 = 0.00792 e+/pulse
Lost beam

go back