Difference between revisions of "September 7, 2011"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
− | Wednesday Run Plan | + | ===Wednesday Run Plan=== |
* Tune up beam | * Tune up beam |
Revision as of 14:34, 7 September 2011
Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.