Difference between revisions of "PhotoFiss 3-2-11"
Jump to navigation
Jump to search
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | [https://wiki.iac.isu.edu/index.php/Feb_PhotFisRun_44MeV_March_2011 Go Back] | ||
+ | |||
=TDC Map= | =TDC Map= | ||
Line 66: | Line 68: | ||
| 3/3/11 || 1826 || Radiator out, 2" lead brick as target | | 3/3/11 || 1826 || Radiator out, 2" lead brick as target | ||
|- | |- | ||
− | | 3/3/11 || | + | | 3/3/11 || 1827 || Radiator in, 1/2" Al slab at end of pair spec. |
|- | |- | ||
− | | 3/ | + | | 3/4/11 || 1831 || 25 MeV FC test, see scope picture #46 |
|- | |- | ||
− | | 3/ | + | | 3/4/11 || || |
|- | |- | ||
− | | 3/ | + | | 3/4/11 || || |
|- | |- | ||
− | | 3/ | + | | 3/4/11 || || |
|- | |- | ||
− | | 3/ | + | | 3/4/11 || || |
|} | |} | ||
− | [[ | + | =Lab Book= |
+ | [[File:March2.pdf]] | ||
+ | |||
+ | [https://wiki.iac.isu.edu/index.php/Feb_PhotFisRun_44MeV_March_2011 Go Back] |
Latest revision as of 16:51, 1 April 2011
TDC Map
TDC Chan | Detector |
1 | Event Trigger |
12 | Sofiia (neutron detector Beam Right down) |
13 | Natali (neutron detector Beam Left down) |
14 | Irina (neutron detector Beam left center) |
15 | Polina (neutron detector Beam left top) |
Runs
Date | Run Number | Comment |
3/2/11 | 1795 | D2O target first ToF attempt |
3/2/11 | 1796 | H2O target first ToF attempt Saw no difference with run 1795 |
3/2/11 | 1797 | 1/4" lead sheet target first ToF attempt |
3/3/11 | 1801 | Faraday Cup test with 200mA beam current |
3/3/11 | 1802 | Faraday Cup test with 100mA beam current |
3/3/11 | 1804 | Faraday cup test using 50mA beam current |
3/3/11 | 1805 | FC test collimating with Copper exposing bricks 16, 17, 18 |
3/3/11 | 1806 | Faraday Cup test with small hole Al collimation |
3/3/11 | 1807 | Faraday Cup test with small hole Al collimation beam bent down (75A) |
3/3/11 | 1808 | Faraday cup test using 1/8" vertical slit collimation kicker magnet off |
3/3/11 | 1809 | Same as 1808 but with kicker magnet bending downward at 75A |
3/3/11 | 1810 | FC test increased beam current (~200mA) kicker off |
3/3/11 | 1811 | FC test with max possible beam current (~225mA) collimated with 4mm vertical slit via Al |
3/3/11 | 1812 | FC test re-run of 1811 to check for consistancy |
3/3/11 | 1813 | FC test with kicker magnet bending downward at 75A |
3/3/11 | 1815 | Lead Target ToF attempt, good looking gamma peak, need more stats |
3/3/11 | 1816 | Lead Target ToF attempt, cancelled due to multiple start pulse problem |
3/3/11 | 1817 | Lead target ToF with 314k events |
3/3/11 | 1822 | Radiator in, no target, 314k events, TDC spectrum looks the same as with lead target |
3/3/11 | 1824 | Radiator in, 2" lead brick as target |
3/3/11 | 1826 | Radiator out, 2" lead brick as target |
3/3/11 | 1827 | Radiator in, 1/2" Al slab at end of pair spec. |
3/4/11 | 1831 | 25 MeV FC test, see scope picture #46 |
3/4/11 | ||
3/4/11 | ||
3/4/11 | ||
3/4/11 |