Setting Timing

Before running beam we must determine the delay times due to cable length in order to set the latency int he VFAT chips.

These measurements should take place during the May 2010 installation.


Setting Thresholds

During the May install we can set a set of baseline thresholds when there is no beam going into the hall.

This will need to be redone during the commissioning run.