Difference between revisions of "HRRLrun 3-22-26-2010"

From New IAC Wiki
Jump to navigation Jump to search
(Created page with 'HRRL run on March 22-26 2010 Preliminary setup =3/17/10= Install detector infrastructure to mount 2 Drift chambers, 2 Scintillators and 1 GEM on a translator table. Install c...')
 
Line 18: Line 18:
  
 
Check channels in histograms
 
Check channels in histograms
 +
 +
 +
Coincidence: Coincidence between Accelerator's RF pulse generator, and several PMTs
 +
 +
TDC start: Accelerator RF pulse generator.
 +
TDC stop:  2 DC, 1 GEM trigout, 4 PMTs
 +
 +
ADC: all FC channels from Accelerator ribbon cable.
 +
ADC gate:  Create timing gate using scope when accelerator
 +
 +
V1495:  Trigger pulse from coincidence logic above
  
 
=3/22/10=
 
=3/22/10=

Revision as of 00:25, 20 March 2010

HRRL run on March 22-26 2010

Preliminary setup

3/17/10

Install detector infrastructure to mount 2 Drift chambers, 2 Scintillators and 1 GEM on a translator table.

Install collimation

3/18/10

Install all detectors and associated electronics (power supplies, cabling, gas lines,...)

3/19/10

install DAQ system and associated readout electronics.

Check channels in histograms


Coincidence: Coincidence between Accelerator's RF pulse generator, and several PMTs

TDC start: Accelerator RF pulse generator. TDC stop: 2 DC, 1 GEM trigout, 4 PMTs

ADC: all FC channels from Accelerator ribbon cable. ADC gate: Create timing gate using scope when accelerator

V1495: Trigger pulse from coincidence logic above

3/22/10

Final day for completing system checks

3/23/10

1pm - 5pm: Tune beam for low and high current

3/24/10

Positron spectrometer run plan

Detector tracking run plan