Difference between revisions of "HRRL 4-13-09"
Jump to navigation
Jump to search
(New page: = Default HRRL running Conditions= = run plan= {| border="3" cellpadding="20" cellspacing="0" | Date || Task |- |4/11/09 || Install Motion Sliders |- |4/12/09 || Install DAQ and Drift c...) |
|||
| Line 1: | Line 1: | ||
= Default HRRL running Conditions= | = Default HRRL running Conditions= | ||
| − | + | {| border="1" cellpadding="20" cellspacing="0" | |
| + | |- | ||
| + | | <math>I_{peak}</math> | ||
| + | | Pulse Width | ||
| + | | Rep Rate | ||
| + | | Energy | ||
| + | |- | ||
| + | | 8 mA || 25 ns || 1 Hz|| 3 MeV | ||
| + | |} | ||
| + | <br> | ||
= run plan= | = run plan= | ||
Revision as of 15:40, 1 April 2009
Default HRRL running Conditions
| Pulse Width | Rep Rate | Energy | |
| 8 mA | 25 ns | 1 Hz | 3 MeV |
run plan
| Date | Task |
| 4/11/09 | Install Motion Sliders |
| 4/12/09 | Install DAQ and Drift chambers |
| 4/13/09 | Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 3 mA peak) |
| 4/14/09 | Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 3 mA peak), Do Plateau measurements and test readout |
| 4/15/09 | Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM |
| 4/16/09 | Run HRRL from 2 pm til 5 pm, efficiency tests |
| 4/17/09 | Run HRRL from 9 am til 5 pm finish detector tracking studies |