Difference between revisions of "Qweak TaskList"

From New IAC Wiki
Jump to navigation Jump to search
(New page: Remaining tasks for installing R1. {| border="1" |cellpadding="20" cellspacing="0 |Start Date |Status | Task |- |})
 
 
(10 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
| Task
 
| Task
 
|-
 
|-
 +
| 11/14/09
 +
| done
 +
| HV test Qweak detector
 +
|-
 +
|
 +
|
 +
|Measure GEM trigout rates -vs- HV
 +
|-
 +
|
 +
|
 +
| Measure GEM tracking resolution
 +
|-
 +
|
 +
|
 +
| Measure GEM QE and uniformity
 +
|-
 +
|
 +
|
 +
| Measure GEM DAQ rate tests using e-beam (what is our max DAQ rate for the system Detector + electronics+CODA)
 +
|-
 +
| 1/20/10
 +
|
 +
|  Hit Pattern GUI from V1495 output
 +
|-
 +
|
 +
|
 +
|  HV remote control software (steve wood has solution we need to copy)
 +
|-
 +
|
 +
|
 +
|  Quick Release GEM detector to rotator attachment system
 +
|-
 +
| 8/27/07
 +
|
 +
|  VFAT control and Monitoring Web interface
 
|}
 
|}
 +
 +
 +
[http://wiki.iac.isu.edu/index.php/Qweak  Go Back] [[Qweak]]

Latest revision as of 13:44, 18 May 2009

Remaining tasks for installing R1.

Start Date Status Task
11/14/09 done HV test Qweak detector
Measure GEM trigout rates -vs- HV
Measure GEM tracking resolution
Measure GEM QE and uniformity
Measure GEM DAQ rate tests using e-beam (what is our max DAQ rate for the system Detector + electronics+CODA)
1/20/10 Hit Pattern GUI from V1495 output
HV remote control software (steve wood has solution we need to copy)
Quick Release GEM detector to rotator attachment system
8/27/07 VFAT control and Monitoring Web interface