Difference between revisions of "Qweak TaskList"

From New IAC Wiki
Jump to navigation Jump to search
Line 37: Line 37:
 
|  
 
|  
 
|  Quick Release GEM detector to rotator attachment system
 
|  Quick Release GEM detector to rotator attachment system
 +
|-
 +
| 8/27/07
 +
|
 +
|  VFAT control and Monitoring Web interface
 
|}
 
|}
  
  
 
[http://wiki.iac.isu.edu/index.php/Qweak  Go Back] [[Qweak]]
 
[http://wiki.iac.isu.edu/index.php/Qweak  Go Back] [[Qweak]]

Revision as of 04:48, 25 January 2009

Remaining tasks for installing R1.

Start Date Status Task
HV test Qweak detector
11/14/09 done Measure GEM trigout rates -vs- HV
Measure GEM tracking resolution
Measure GEM QE and uniformity
Measure GEM DAQ rate tests using e-beam (what is our max DAQ rate for the system Detector + electronics+CODA)
Hit Pattern GUI from V1495 output
HV remote control software (steve wood has solution we need to copy)
Quick Release GEM detector to rotator attachment system
8/27/07 VFAT control and Monitoring Web interface


Go Back Qweak