Difference between revisions of "GEM Cosmic V792 Measurements"

From New IAC Wiki
Jump to navigation Jump to search
Line 11: Line 11:
  
 
[[Image:ADC_measurement_GEMDetector_HV3800V_ADC1_11-05-08_log_scale.gif|300px]]<br>
 
[[Image:ADC_measurement_GEMDetector_HV3800V_ADC1_11-05-08_log_scale.gif|300px]]<br>
 +
 +
=11-06-08=
 +
 +
The pulse coming from the strips is delayed and  connected to the V792 QDC.<br>
 +
Run 536<br>
 +
 +
Start Time: Nov 4 13:49:30; End Time: Nov 6<br>
 +
 +
[[Image:ADC_measurement_GEMDetector_HV3800V_ADC1_11-06-08_log_scale.gif|300px]]<br>
  
 
[http://www.iac.isu.edu/mediawiki/index.php/GEMS Go Back]
 
[http://www.iac.isu.edu/mediawiki/index.php/GEMS Go Back]

Revision as of 03:05, 6 November 2008

11-04-08

ADC measurement GEMDetector HV3800V ADC1 11-04-08.gifADC measurement GEMDetector HV3800V ADC1 11-04-08 log scale.gif
ADC measurement GEMDetector HV3800V ADC1 11-04-08 zoomed in.gif

11-05-08

The pulse coming from the strips is delayed and amplified using the Timing Filter Amplifier Model_474(Fine gain ~6). The amplified pulse is connected to the V792 QDC.
Run 535

Start Time: Nov 4 17:32:07; End Time: Nov 5 13:35:43

ADC measurement GEMDetector HV3800V ADC1 11-05-08 log scale.gif

11-06-08

The pulse coming from the strips is delayed and connected to the V792 QDC.
Run 536

Start Time: Nov 4 13:49:30; End Time: Nov 6

300px

Go Back