Difference between revisions of "10-31-08 GEM HRRL Photon Runs"

From New IAC Wiki
Jump to navigation Jump to search
Line 34: Line 34:
  
  
ADC 1D has clear second peak at channel 150 but ADC1 does not.  Lets Observe ADC 1D as a runction of position.  This corresponds to GEM output strip 13.
+
ADC 1D has clear second peak at channel 150 but ADC1 does not.  Lets Observe ADC 1D as a function of position.  This corresponds to GEM output strip 13.
  
 
5 minutes long
 
5 minutes long

Revision as of 22:00, 31 October 2008

The Goal today is to observe position dependence of photons on the GEM detector


A1 -> 13 A2 -> 11 A3 -> Trig A4 -> 2 A6 -> 16 A7 -> 8 A8 -> 5 A9 -> NaI -> B9


B1 -> ADC1A


Run 1

GEM Backgrnd.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =0

5 minutes long

Run 2

Run2.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


ADC 1D has clear second peak at channel 150 but ADC1 does not. Lets Observe ADC 1D as a function of position. This corresponds to GEM output strip 13.

5 minutes long


Go back