Difference between revisions of "PhotoFissionOctoberAnalysis"

From New IAC Wiki
Jump to navigation Jump to search
Line 18: Line 18:
  
 
5.) Threshold match procedure (Tony)
 
5.) Threshold match procedure (Tony)
 +
 +
Did the unpolarized runs on the last day have matched thresholds?
 +
 +
Compare Asym in single run to asym when detectors swapped
 +
 +
6.) H20,C,Si,Pb,N(<math>\gamma</math>,n), X-sections  Neutron producers? (Jasen, Ariel, Sam)
 +
 +
Black lead shot collimator increased neutron flux by factor 2?
 +
 +
7.) Origin curve Fitting (Valeriia)
 +
 +
8.) U rate estimate (Dale)
 +
 +
9.) Asym -vs TDC (MeV)
 +
 +
10.) What improvement in beam is needed
 +
 +
11.) FFT of N ToF
 +
 +
 +
=11/5/08=
 +
 +
Tasks:
 +
 +
1.) Run Tables (Alex) (Done)
 +
 +
2.) ASCII file generation (Sam) (Done)
 +
 +
3.) TDC -> time -> Neutron Energy calibration (Sadiq) (Maybe Done)
 +
 +
4.) Reproducibility tests (Dale(busy talking), Alex)
 +
 +
a.) Gamma & Neutron rate change
 +
 +
b.)NaI/Ref -vs run number and Target (Wheres de photons)
 +
 +
c.) Asym the same between detectors in same run and same detector in different runs
 +
 +
5.) Threshold match procedure (Tony(busy writing))
  
 
Did the unpolarized runs on the last day have matched thresholds?
 
Did the unpolarized runs on the last day have matched thresholds?

Revision as of 23:30, 5 November 2008

10/28/08

Tasks:

1.) Run Tables (Alex)

2.) ASCII file generation (Sam)

3.) TDC -> time -> Neutron Energy calibration (Sadiq)

4.) Reproducibility tests (Dale, Alex)

a.) Gamma & Neutron rate change

b.)NaI/Ref -vs run number and Target (Wheres de photons)

c.) Asym the same between detectors in same run and same detector in different runs

5.) Threshold match procedure (Tony)

Did the unpolarized runs on the last day have matched thresholds?

Compare Asym in single run to asym when detectors swapped

6.) H20,C,Si,Pb,N([math]\gamma[/math],n), X-sections Neutron producers? (Jasen, Ariel, Sam)

Black lead shot collimator increased neutron flux by factor 2?

7.) Origin curve Fitting (Valeriia)

8.) U rate estimate (Dale)

9.) Asym -vs TDC (MeV)

10.) What improvement in beam is needed

11.) FFT of N ToF


11/5/08

Tasks:

1.) Run Tables (Alex) (Done)

2.) ASCII file generation (Sam) (Done)

3.) TDC -> time -> Neutron Energy calibration (Sadiq) (Maybe Done)

4.) Reproducibility tests (Dale(busy talking), Alex)

a.) Gamma & Neutron rate change

b.)NaI/Ref -vs run number and Target (Wheres de photons)

c.) Asym the same between detectors in same run and same detector in different runs

5.) Threshold match procedure (Tony(busy writing))

Did the unpolarized runs on the last day have matched thresholds?

Compare Asym in single run to asym when detectors swapped

6.) H20,C,Si,Pb,N([math]\gamma[/math],n), X-sections Neutron producers? (Jasen, Ariel, Sam)

Black lead shot collimator increased neutron flux by factor 2?

7.) Origin curve Fitting (Valeriia)

8.) U rate estimate (Dale)

9.) Asym -vs TDC (MeV)

10.) What improvement in beam is needed

11.) FFT of N ToF


Go back