Difference between revisions of "October 17, 2008"
Jump to navigation
Jump to search
| (One intermediate revision by the same user not shown) | |||
| Line 5: | Line 5: | ||
We switched detectors A and C, and ran the accelerator with <math> D_{2}O </math> target for 1 hour broken into 2 separate 30 minute runs. | We switched detectors A and C, and ran the accelerator with <math> D_{2}O </math> target for 1 hour broken into 2 separate 30 minute runs. | ||
| − | Then we ran accelerator with <math> H_{2}O </math> target for | + | Then we ran accelerator with <math> H_{2}O </math> target for 1 hour broken into 2 separate 30 minute runs. |
Took a timing spectrum with an empty plastic water bottle (the exact same type of bottle holding the <math> H_{2}O </math> and the <math> D_{2}O </math> targets), running the accelerator for 30 minutes. | Took a timing spectrum with an empty plastic water bottle (the exact same type of bottle holding the <math> H_{2}O </math> and the <math> D_{2}O </math> targets), running the accelerator for 30 minutes. | ||
| Line 11: | Line 11: | ||
Took a timing spectrum with no target at all, running the accelerator for 1 hour. | Took a timing spectrum with no target at all, running the accelerator for 1 hour. | ||
| − | [http:// | + | [http://wiki.iac.isu.edu/index.php/October_Fission_HRRL_Measurements_2008 Go Back] |
Latest revision as of 06:31, 5 February 2009
Ran accelerator for 2.5 hours with target.
Ran accelerator for 30 minutes with target.
We switched detectors A and C, and ran the accelerator with target for 1 hour broken into 2 separate 30 minute runs.
Then we ran accelerator with target for 1 hour broken into 2 separate 30 minute runs.
Took a timing spectrum with an empty plastic water bottle (the exact same type of bottle holding the and the targets), running the accelerator for 30 minutes.
Took a timing spectrum with no target at all, running the accelerator for 1 hour.