Difference between revisions of "Qweak Installation"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
Region 1 Rotator installation on | Region 1 Rotator installation on | ||
− | March, 2010 | + | March 2, 2010 |
Region 1 detector install and checkout | Region 1 detector install and checkout | ||
− | + | March 22, 2010: Assemble region 1 chamber | |
=Definitions= | =Definitions= |
Revision as of 16:25, 28 July 2008
Information for installing the R1 chambers into Hall C
Target Installation Date
The target date to install the R1 chambers in Hall C is
Nov. 2009
Region 1 Rotator installation on
March 2, 2010
Region 1 detector install and checkout
March 22, 2010: Assemble region 1 chamber
Definitions
- Survey tolorance
- The accuracy in the absolute location of an object
- Alignment Tolerance
- The accuracy of an object relative some other known object.
- "Would like to"
- desired alignment accuracy
- "Must have"
- Required alignment accuracy
- "Known to"
- desired survey accuracy
Tolorances
The charge collector strips are less than 0.4 mm wide. The concentric strips can give you a direct measurement of the electron scattering angle
if they are properly alignment with the beam line.
The numbers below are just a Guess with no justification from a simulation or hand calculation.
Tolorance for GEM relative to the PRIMARY COLLIMATOR (2nd collimator)
Survey can pretend to do 50 micron resolution 200 micron resolution is no problem.
Survey marker tooling balls need 1/4 inch rods to mount prisms on. Should have at least 3, 1/4 holes on detector.
Coordinate | "Would like to" | "Must have" | Known to |
(mm) | (mm) | (mm) | |
X | 0.2 | 0.4 | 0.2 |
Y | 0.2 | 0.4 | 0.2 |
Z | 1 | 10 | 1 |
Yaw(about Y) | |||
Pitch (about X) | |||
Roll(about Z) |