Difference between revisions of "Progress reports"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (→3/7/08)  | 
				|||
| Line 4: | Line 4: | ||
=3/7/08=  | =3/7/08=  | ||
| + | |||
| + | Progress modeling the R3 drift chamber has been held back by both software and hardware problems.  This past week we installed ANSYS on a faster computer ( 2 GHz Intel with 3Meg RAM) and were able to render the design in 30 minutes instead of 2 hours.  The turnaround for debugging the geometrical design is now faster and the computer does not currently crash.  We plan on doing the same test using a new computer (2 GHz Intel with 8 Meg RAM) once it has been assembled (2 weeks or less).  | ||
| + | |||
| + | The image below represent the current Model which has been implemented in ANSYS.  | ||
[[Image:R3_3D_AnsysModel_3-7-08.jpg | 200 px]]  | [[Image:R3_3D_AnsysModel_3-7-08.jpg | 200 px]]  | ||
Revision as of 00:55, 9 March 2008
R3 design Progress report
3/7/08
Progress modeling the R3 drift chamber has been held back by both software and hardware problems. This past week we installed ANSYS on a faster computer ( 2 GHz Intel with 3Meg RAM) and were able to render the design in 30 minutes instead of 2 hours. The turnaround for debugging the geometrical design is now faster and the computer does not currently crash. We plan on doing the same test using a new computer (2 GHz Intel with 8 Meg RAM) once it has been assembled (2 weeks or less).
The image below represent the current Model which has been implemented in ANSYS.