Difference between revisions of "IAC 2-29-08"
Jump to navigation
Jump to search
(→Runs) |
(→Runs) |
||
| Line 35: | Line 35: | ||
| Run # || Description | | Run # || Description | ||
|- | |- | ||
| − | |431|| 0" from feedthrough | + | |431|| 0" from feedthrough , Sense wire at 1450 Volts |
| + | |- | ||
| + | |432|| 0" from feedthrough , Sense wire at 1500 Volts | ||
|- | |- | ||
|} | |} | ||
Revision as of 16:30, 29 February 2008
Leap Day run
DC setup
This time the Sense wire HV is set to 1500 to start
90/10 ArCo2
| HV settings | ||
| Wire | Volts | current (A) |
| Sense | 1500 | |
| Field | -750 | |
| Guard | 750 | |
DC preamp at 5.6 Volts
Beam Line Configuration
A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall. A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser. A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle. A coincidence is required between the two scintillators.
Increased beam energy from 10 MeV to 12 MeV due to expected energy loss in front scintillator.
Runs
| Run # | Description |
| 431 | 0" from feedthrough , Sense wire at 1450 Volts |
| 432 | 0" from feedthrough , Sense wire at 1500 Volts |