Difference between revisions of "IAC 1-4-08"

From New IAC Wiki
Jump to navigation Jump to search
Line 2: Line 2:
  
 
90/10 ArCo2
 
90/10 ArCo2
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|colspan= "3" | HV settings
 +
|-
 +
| Wire ||  Volts || current (<math>\mu</math>A)
 +
|-
 +
|Sense ||  1500 ||
 +
|-
 +
|Field ||  -750 ||
 +
|-
 +
|Guard ||  750 ||
 +
|}
  
 +
 +
We put an aluminum brick in front of the electron beam in order to look at photons hitting the Drift Chamber.
 +
We saw a signal output oout of the drift chamber once for every 10 gun pulses.
  
 
[[Image:Gun-Metalica_PostAmp_1-4-08_A.jpg | 200 px]]
 
[[Image:Gun-Metalica_PostAmp_1-4-08_A.jpg | 200 px]]

Revision as of 00:18, 5 January 2008

Today we installed the drift chambers and had our first beam on target.

90/10 ArCo2

HV settings
Wire Volts current ([math]\mu[/math]A)
Sense 1500
Field -750
Guard 750


We put an aluminum brick in front of the electron beam in order to look at photons hitting the Drift Chamber. We saw a signal output oout of the drift chamber once for every 10 gun pulses.

200 px 200 px

Go Back