Difference between revisions of "IAC LeadFlourideCherenkovCrystalTests"

From New IAC Wiki
Jump to navigation Jump to search
Line 14: Line 14:
  
  
We find.  Time on for one second is 1 us. and Time off is 0.999999 s The average current 0.999999 * 0 + 0.000001*50mA = 0.05 uA.
+
Time on for one second is 1 us. and Time off is 0.999999 s The average current 0.999999 * 0 + 0.000001*50mA = 0.05 uA.
  
 
P = (20 MeV) * (0.05 uA) = 1 Watt.
 
P = (20 MeV) * (0.05 uA) = 1 Watt.
  
  
With the proviso, that we wish to keep the I_peak (Instantaneous Current in the pulse) well above 5 mA so the it can be tracked by the pick-up coil.  50 mA/pulse will do the job.
+
With the proviso, that we need to keep the I_peak (Instantaneous Current in the pulse) well above 5 mA so the it can be tracked by the pick-up coil.  50 mA/pulse will do the job.
  
Crew:  Tony Forest, Adrianne Spilker, Amine Mestari, Syed Naeem, Pierre Bertin, and Phil Cole
+
Crew:  Pierre Bertin, Tony Forest, Adrianne Spilker, Amine Mestari, Syed Naeem, and Phil Cole
  
 
Status of Setup.
 
Status of Setup.
Line 31: Line 31:
 
     Setup
 
     Setup
 
     DAQ/Readout
 
     DAQ/Readout
   Coil
+
   Pickup Coil
 
     Setup  
 
     Setup  
 
     DAQ/Readout
 
     DAQ/Readout
Line 37: Line 37:
 
    
 
    
  
Translator table setup.
+
Day 0 will be for final setup.  Pierre, Tony, and Adrianne.
o Day 1: 5 hours of beamtime
 
  1a) a first irradiation(blocks 1~4) ~5 hours Day 1
 
  2a) do a transparency measurement (blocks 1~4) ~3 hours Day 1
 
  3a) do a block (blocks 1~4) curing exposure to a blue light 24 hours day 1 day
 
 
 
o Day 2:  5 hours of beamtime
 
  1b) a first irradiation(blocks 5~8) ~5 hours Day 2
 
  2b) do a transparency measurement (blocks 5~8) ~3 hours Day 2
 
  3b) do a block (blocks 5~8 curing exposure to a blue light 24 hours Day 2 and Day 3
 
 
 
 
 
o Day 3:  5 hours + 5 hours of beamtime.
 
  4a) repeat a transparency measurement (blocks 1~4) ~3hours day 3
 
  5a) do a second irradiation (blocks 1~4) ~5 hours day 3
 
  3a) do a transparency measurement (blocks 1~4) ~3 hours day 3
 
  4b) repeat a transparency measurement (blocks 5~8) ~3 hours day 3
 
  5b) do a second irradiation (blocks 5~8) ~5 hours day 3 at the end of the day
 
 
 
  
 
Day 4 and Day 5 will be used to more curing and transparency measurements.
 
Day 4 and Day 5 will be used to more curing and transparency measurements.

Revision as of 19:40, 20 November 2007

Radiation exposure tests in December for Hall A.

We will have three days of beamtime (Dec 3-5). We will use the the 25-MeV linac to direct an electron beam upon the PbF2 crystals. The lead Flouride Crystals will be placed on a translator table so that each crystal can moved into the beam. The crystals are 30x30x185 mm^3 and are 1290g each.


We need to keep the Power below one 1 Watt onto the PbF2 crystal or 0.78 Gy/block. We can achieve this by setting the beam parameters of the 25-MeV LINAC (cf. http://www.iac.isu.edu/facilities/25MeV_hall.html).

Here we have: P = E * I [P] Watts, [E] MeV, and [I] uA

beam energy  20 MeV
Rep Rate:    10 Hz
I_peak:      50 mA/pulse
pulse width: 0.1 us (100 ns)


Time on for one second is 1 us. and Time off is 0.999999 s The average current 0.999999 * 0 + 0.000001*50mA = 0.05 uA.

P = (20 MeV) * (0.05 uA) = 1 Watt.


With the proviso, that we need to keep the I_peak (Instantaneous Current in the pulse) well above 5 mA so the it can be tracked by the pick-up coil. 50 mA/pulse will do the job.

Crew: Pierre Bertin, Tony Forest, Adrianne Spilker, Amine Mestari, Syed Naeem, and Phil Cole

Status of Setup.

 Translator Table (3 degrees of freedom).  
    Setup Done.  Amine and Adrianne
    DAQ/Readout
 Faraday Cups
    Setup
    DAQ/Readout
 Pickup Coil
    Setup 
    DAQ/Readout
 Lead Shielding
 

Day 0 will be for final setup. Pierre, Tony, and Adrianne.

Day 4 and Day 5 will be used to more curing and transparency measurements.



The specifics are listed below RunPlan:

PbFl_RadTests-12-3-07

PbFl_RadTests-12-4-07

PbFl_RadTests-12-5-07


References:

NIM articles:

File:Achenbach NIM A416 1998 pg357.pdf


Private Communications

File:FEL IrradiationTests 8-25-07.pdf
File:TransmissionTestProcedure J.Roche 10-15-07.pdf
File:CalorimeterHeatingEquations.pdf