Difference between revisions of "CLAS12 R1"
Jump to navigation
Jump to search
| Line 1: | Line 1: | ||
| + | =R1 Construction preparations= | ||
| + | |||
| + | 1.) Budget | ||
| + | |||
| + | 2.) Clean room | ||
| + | |||
| + | 3.) hiring timeline | ||
| + | |||
| + | |||
| + | 9/08 NSF proposal submission | ||
| + | |||
| + | |||
| + | 4.) stringing platform and DC stringing support arm | ||
| + | |||
| + | 5.) Manpower | ||
| + | |||
| + | 6.) MOU to support post doc request or faculty release time | ||
| + | |||
| + | 7.) | ||
| + | |||
| + | |||
| + | |||
| + | |||
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. | A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall. | ||
[[CLAS12_R1_Prototype_9-16-07]] | [[CLAS12_R1_Prototype_9-16-07]] | ||
Revision as of 14:45, 2 June 2008
R1 Construction preparations
1.) Budget
2.) Clean room
3.) hiring timeline
9/08 NSF proposal submission
4.) stringing platform and DC stringing support arm
5.) Manpower
6.) MOU to support post doc request or faculty release time
7.)
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall.
CLAS12_R1_Prototype_9-16-07
The air actuated crimping tool: