Difference between revisions of "DOE EPSCoR Proposal"
Jump to navigation
Jump to search
(→Year 2) |
|||
Line 16: | Line 16: | ||
#measure tungsten converter target performance as function of IAC beam current | #measure tungsten converter target performance as function of IAC beam current | ||
# IAC beam is x 40 less power than what will be needed at JLAB | # IAC beam is x 40 less power than what will be needed at JLAB | ||
+ | |||
+ | = Parts list = | ||
+ | |||
+ | [http://www.thermionics.com/fara_cup.htm FC $5k 400 W max power] |
Revision as of 21:44, 14 June 2007
A Positron Source for JLAB
Year 1
- Check positron productions efficiency simulations for 10-20 MeV electrons on Tungsten Target
- Measure positron emmitance and compare to simulation predictions
- Repeat above measurements at different tilt angles
Year 2
- Use Genetic algorithm with Simulation predictions to optimize positron production
- Begin designing tungsten converter capable of handling high heat load
- CEBAF can accept particles into acceleration stage as long as
- Electrons are injected at 500 MeV (1 GeV) for a 6 GeV (12 GeV) CEBAF. Currently
Year 3
- Test design configuration from Genetic Algorithm at the IAC
- measure tungsten converter target performance as function of IAC beam current
- IAC beam is x 40 less power than what will be needed at JLAB