===5/11/21=== | ===5/11/21=== | ||
− | Painted half size lead bricks (1" | + | Painted half size lead bricks (1"x4"x8") with red epoxy based paint for safer handling when building shielding arrays. Made the mistake of letting them dry on porous surface and now have to find way to remove cardboard that is sealed to the last unpainted side of bricks. |
Line 18: | Line 12: | ||
[[File:PAS_Painted_Lead_Bricks_2.jpg|300px|thumb|center|Half of the first set of painted lead bricks on cardboard drying surface.]] | [[File:PAS_Painted_Lead_Bricks_2.jpg|300px|thumb|center|Half of the first set of painted lead bricks on cardboard drying surface.]] | ||
+ | |||
+ | |||
===5/27/21=== | ===5/27/21=== | ||
Line 33: | Line 29: | ||
[[File:CH_Fully_Painted_Pb_Bricks.jpg|300px|thumb|none|Fully painted lead bricks air drying on steel table after wipe down]] | [[File:CH_Fully_Painted_Pb_Bricks.jpg|300px|thumb|none|Fully painted lead bricks air drying on steel table after wipe down]] | ||
− | == Lead Sheet == | + | == '''Lead Sheet''' == |
===5/17/21 - 5/18/21=== | ===5/17/21 - 5/18/21=== | ||
Line 55: | Line 51: | ||
[[File:PAS_Lead_Sheet_Edge_Taped.jpg|300px|thumb|center|Half of the first set of painted lead bricks on cardboard drying surface.]] | [[File:PAS_Lead_Sheet_Edge_Taped.jpg|300px|thumb|center|Half of the first set of painted lead bricks on cardboard drying surface.]] | ||
+ | ='''Borated Aluminum'''= | ||
+ | |||
+ | B12 and B4C structures in aluminum | ||
+ | |||
+ | * Might be possible to separate the aluminum with elemental mercury or could melt the aluminum | ||
+ | ** Aluminum oxide has a higher melting point (~2000C) than elemental aluminum which is still lower than B4C (~2700C) | ||
+ | |||
+ | ='''Polyethylene'''= | ||
+ | |||
+ | ==Borated Polyethylene== | ||
+ | |||
+ | ===Virgin Polyethylene=== | ||
+ | ===Green Borated Polyethylene=== | ||
+ | *The concentration of boron is unknown at the current time | ||
+ | ===Light Purple Borated Polyethylene=== | ||
+ | *The concentration of boron is unknown at the current time | ||
---- | ---- | ||
[[PAS_Experiment]] | [[PAS_Experiment]] |
Latest revision as of 19:33, 20 December 2022
Lead
Lead Bricks
5/11/21
Painted half size lead bricks (1"x4"x8") with red epoxy based paint for safer handling when building shielding arrays. Made the mistake of letting them dry on porous surface and now have to find way to remove cardboard that is sealed to the last unpainted side of bricks.
5/27/21
Finished painting lead bricks which need to dry/cure for 24-48hrs
6/1/21
- Moved dried/cured painted lead bricks from painting area to clean room
- Cleaned each brick with a wet wipe before transition into clean room, will be allowed to air dry on steel table
- 50 bricks total: 49 half bricks and 1 full brick
Lead Sheet
5/17/21 - 5/18/21
Sheared a lead sheet into 6 rough 3"x3" squares to be used for attenuation measurements with NaI detectors
Lead pieces were wiped down with a wet wipe, duct taped, rewiped, and hammered flat.
Thickness of the lead pieces is around 0.055".
Borated Aluminum
B12 and B4C structures in aluminum
- Might be possible to separate the aluminum with elemental mercury or could melt the aluminum
- Aluminum oxide has a higher melting point (~2000C) than elemental aluminum which is still lower than B4C (~2700C)
Polyethylene
Borated Polyethylene
Virgin Polyethylene
Green Borated Polyethylene
- The concentration of boron is unknown at the current time
Light Purple Borated Polyethylene
- The concentration of boron is unknown at the current time