Difference between revisions of "CH Weekly Reports"

From New IAC Wiki
Jump to navigation Jump to search
Line 7: Line 7:
 
* Sourced material needed for CaGaS Phase II setup.
 
* Sourced material needed for CaGaS Phase II setup.
  
* Calculated ADC dead time for live-time correction to efficiency measurement count rates.
+
* Calculated ADC dead time for live-time correction to efficiency measurement count rates and calculated dead time per experiment.
  
 
* Designed holder for Gd foils needed for CaGaS Phase II experiment. To be 3D printed and tested for tolerances.
 
* Designed holder for Gd foils needed for CaGaS Phase II experiment. To be 3D printed and tested for tolerances.

Revision as of 21:24, 22 September 2022

09/19/22

  • Investigated non-linearity of peak sensing ADC due to issues arising in energy calibrations and efficiency measurements.
  • Modified existing calibration code to use non-linear regression to account for ADC.
  • Sourced material needed for CaGaS Phase II setup.
  • Calculated ADC dead time for live-time correction to efficiency measurement count rates and calculated dead time per experiment.
  • Designed holder for Gd foils needed for CaGaS Phase II experiment. To be 3D printed and tested for tolerances.

Previous Page

PAS Experiment