Difference between revisions of "CH HPGe Electronics Chain"

From New IAC Wiki
Jump to navigation Jump to search
(Created page with " ---- PAS Feasibility Study Runs")
 
Line 1: Line 1:
 +
HPGe -> Split signal using BNC T junction
  
 +
-> First line to spec amp -> peak sensing ADC
  
 +
-> Second line to timing/filter amp with ~2.3x amplification (also inverts)
 +
 +
--> Discriminator (Blue lecroy model #xxxx)
 +
 +
---> Top of dual timer then into bottom of dual timer
 +
 +
---->
  
  

Revision as of 17:46, 20 December 2021

HPGe -> Split signal using BNC T junction

-> First line to spec amp -> peak sensing ADC

-> Second line to timing/filter amp with ~2.3x amplification (also inverts)

--> Discriminator (Blue lecroy model #xxxx)

---> Top of dual timer then into bottom of dual timer


>




PAS Feasibility Study Runs