'''To Do List'''
 
'''To Do List'''
  
* Start mcnp simulations
+
* Start mcnp simulations (X)
 
** Find level of boron doping in poly through simulations  
 
** Find level of boron doping in poly through simulations  
***
 
  
* Print NaI cradle
+
* Print NaI cradle (X)
 +
** Cradle is printed, need to pick up (X)
  
 
* Photon attenuation measurements for lead with NaI  
 
* Photon attenuation measurements for lead with NaI  
Line 68: Line 68:
 
*** boral around all sides and make exit with lead bricks  
 
*** boral around all sides and make exit with lead bricks  
  
* BorAl attenuation measurements for neutrons with He3
+
* BorAl attenuation measurements for neutrons with He3 (X)
** Thermalizing box, with and without an extra sheet of poly between source and detector  
+
** Thermalizing box, with and without an extra sheet of poly between source and detector (not necessary)
 +
*** Green borated poly and regular poly (X)
  
* Neutron attenuation through 360 degree coverage of He3 with BorAl, plus borated poly
+
* Rebuild computer with updated operating system and rebuilt with newest version of root (X)
** Repeat of previous attenuation measurements with borated poly, just with detector surrounded by BorAl instead, do again with nonborated poly
 
  
* Rebuild computer with updated operating system and rebuilt with newest version of root
+
* Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector (not necessary)
  
* Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector
+
* (if time) Measure background with He3 and NaI in shielded tunnel for experimental setup
 +
 
 +
* Design the thermalizing box in some 3D modeling software to allow for easy manipulation without cutting extra poly (X)
 +
** Wiki page has been created in regards to this (X)
 +
 
 +
==9/7/21==
 +
 
 +
* Longer Cf252 measurements (Gd in & out) (X)
 +
 
 +
* More lead in front of Cf252 (maybe in pig) (X)
 +
 
 +
* He3 tube measurements (maybe) (X)
 +
 
 +
* Finish isotope table (X)
 +
 
 +
* Solved binning issues regarding calibrated spectrum (X)
 +
 
 +
==9/23/21==
 +
 
 +
* HPGe Efficiency
 +
 
 +
* Print cradles for HPGe detector
 +
 
 +
* Draw electronics chain for HPGe detector with each value notated
 +
 
 +
* Find dead time using upper and lower part of dual timer (Live time)
 +
 
 +
==11/16/21==
  
* (if time) Measure background with He3 and NaI in shielded tunnel for experimental setup
+
* Check attenuation measurements for Cf252 through poly to look for double counting
  
 +
='''Go Back'''=
  
 
----
 
----
 +
[[CH_PAS_Master_Timeline]]
 +
 
[[PAS_Experiment]]
 
[[PAS_Experiment]]

Latest revision as of 00:27, 17 November 2021

Notes from biweekly meetings

5/27/21

To Do List

  • Add dual timer configuration to plateau page (X)
  • Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots (X)
    • Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github)
  • NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead
  • Begin experimental setup in clean room (X)
  • Test HPGe detector -> Work has begun on this by a colleague
  • Complete latest assigned training module (X)
  • Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
  • Move painted lead bricks to clean room (X)
  • Linked manual for HPGe detector to wiki pages (X)
    • Add files sent by collaborator on HPGe detector page
  • Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X)
    • Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X)
  • Finish 1100V source out data collection (X)
  • Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list
  • Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X)
  • Create wiki page for DD generator page
    • Include shielding papers and manuals -> will talk to Joe about this
  • Paul got his tape measure unstuck from the clean room (X)
    • We're all very proud of him

6/10/21

To Do List

  • Finish attenuation measurements (X) and data analysis for He3 detector (X)
    • Virgin poly (X)
  • Continue experimental set up (X)
  • Model cradle for NaI detector for lead tube (X)
  • Talk to Roy Dunker about HPGe software (X)
    • Have CDs for the software, colleague will attempt to get it working

6/24/21

To Do List

  • Start mcnp simulations (X)
    • Find level of boron doping in poly through simulations
  • Print NaI cradle (X)
    • Cradle is printed, need to pick up (X)
  • Photon attenuation measurements for lead with NaI
    • Start with sheets, then go to one or two bricks
      • boral around all sides and make exit with lead bricks
  • BorAl attenuation measurements for neutrons with He3 (X)
    • Thermalizing box, with and without an extra sheet of poly between source and detector (not necessary)
      • Green borated poly and regular poly (X)
  • Rebuild computer with updated operating system and rebuilt with newest version of root (X)
  • Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector (not necessary)
  • (if time) Measure background with He3 and NaI in shielded tunnel for experimental setup
  • Design the thermalizing box in some 3D modeling software to allow for easy manipulation without cutting extra poly (X)
    • Wiki page has been created in regards to this (X)

9/7/21

  • Longer Cf252 measurements (Gd in & out) (X)
  • More lead in front of Cf252 (maybe in pig) (X)
  • He3 tube measurements (maybe) (X)
  • Finish isotope table (X)
  • Solved binning issues regarding calibrated spectrum (X)

9/23/21

  • HPGe Efficiency
  • Print cradles for HPGe detector
  • Draw electronics chain for HPGe detector with each value notated
  • Find dead time using upper and lower part of dual timer (Live time)

11/16/21

  • Check attenuation measurements for Cf252 through poly to look for double counting