Difference between revisions of "CH PAS Master Timeline"

From New IAC Wiki
Jump to navigation Jump to search
 
(32 intermediate revisions by the same user not shown)
Line 208: Line 208:
 
** Next step is to model a cradle for He3 detector to be used in tunnel, then redesign for HPGe detector
 
** Next step is to model a cradle for He3 detector to be used in tunnel, then redesign for HPGe detector
  
=Future tasks not on meeting task list=
+
* Built experimental setup with Paul and attempted to get an energy spectrum through ADC
 +
 
 +
==7/13/21==
 +
 
 +
* Compiled resources related to DAQ systems, specifically readout controller
 +
 
 +
* Need to find a more reliable scope, may be one in LDS
 +
 
 +
* Ran NaI through ADC and got energy spectrum. No calibration yet. Will update wiki later in week with fine details
 +
** Ran source out, source in, source in & Cadmium sheet
 +
*** Noticeable changes in each
 +
 
 +
==7/14/21==
 +
 
 +
* Adjusted thermalizing box design for easier source access
 +
** Took measurements of all poly needed
 +
** Preparing to cut poly to rebuild thermalizing box as designed
 +
 
 +
* Designed cradle for He3 detector use in experimental setup
 +
 
 +
* Continued python lessons
 +
 
 +
* Emailed Josh Pak at ISU regarding chemical separations
 +
 
 +
* Emailed Jack Bradley to get centos 7 disk
 +
 
 +
* Did trial cuts on poly with Dr. Forest and found a method that gives accurate cuts
 +
 
 +
==7/15/21==
 +
 
 +
* Continued fine tuning 3D design
 +
 
 +
* Worked on more python lessons
 +
 
 +
==7/16/21==
 +
 
 +
* Cut pieces of poly for thermalizing box
 +
 
 +
* Built experimental setup
 +
 
 +
* Discussed a run plan with Paul for next week
 +
 
 +
* Created run plan for next week
 +
 
 +
==7/19/21==
 +
 
 +
* Rendered images of experimental setup and uploaded to wiki page
 +
 
 +
* Uploaded pictures taken of experimental setup
 +
 
 +
* Finalized run plan for NaI and He3
 +
 
 +
* Executed NaI run plan for preliminary measurements
 +
 
 +
* Spoke to Roy Dunker about using Cs137, Co60, & Eu152 in clean room
 +
:* Paperwork being filed with TSO
 +
 
 +
==7/20/21==
 +
 
 +
* Executed He3 run plan for preliminary measurements
 +
 
 +
* Met with Jeff Burggraf regarding ADC calibration and fixing NaI bases
 +
:* Also spoke about using ADC and possible improvements
 +
 
 +
==7/21/21==
 +
 
 +
* Ran both He3 and NaI with/without converter through ADC to create plots
 +
 
 +
* Began disassembly of NaI bases to find issue
 +
:* Both multimeters used were questionable, need 9V battery and fuses
 +
 
 +
* Created plots of NaI and He3 measurements of past two days
 +
 
 +
* Managed to copy files off of daq2 and onto minerve, cannot currently copy from minerve to local machine, had to rely on thumbstick
 +
:* Cannot access root files easily without manual transfer before leaving ISU - will speak to CoSE IT about SCP issue
 +
 
 +
* Have access to the source certificate for Cf252 source through Jeff Burggraf
 +
 
 +
==7/22/21==
 +
 
 +
* Analyzed NaI and He3 energy spectrum data from ADC with Gd converter in/out
 +
 
 +
* Presented data taken in experimental setup to INL collaborators
 +
 
 +
* Discovered previously unknown artifact affecting data analysis on DAQ computer using various techniques including moving files to another machine for analysis and adjusting run parameters to give a known output. None were repeatable.
 +
 
 +
==7/23/21==
 +
 
 +
* Continued to debug the DAQ system, most likely culprit is a bad RAM stick
 +
 
 +
==7/26/21==
 +
 
 +
* Spoke with Tony regarding upgrading to new DAQ
 +
 
 +
* Spoke with CoSE IT regarding upgrading to new DAQ
 +
 
 +
* Started process of upgrading to new DAQ
 +
:* First task is to get centos 7 up and running on a separate drive if possible. Currently the system cannot see the second disk through bios or centos 7 installer
 +
 
 +
* See here: [[DAQ2 Upgrade Summer 2021]]
 +
 
 +
==7/27/21==
 +
 
 +
* Continued updating new DAQ
 +
 
 +
* Mounted 1TB disk as storage for centos 7 under directory ''Data''
 +
 
 +
==7/28/21==
 +
 
 +
* Continued updating new DAQ, ''still''
 +
 
 +
* See here: [[DAQ2 Upgrade Summer 2021]]
 +
 
 +
==7/29/21==
 +
 
 +
* Continued updating new DAQ, ''even more''
 +
 
 +
* Planned rest of summer work with Paul regarding feasibility study
 +
 
 +
='''August'''=
 +
 
 +
==8/3/21==
 +
 
 +
* New DAQ has hit a wall with library issues not allowing evio2nt to parse dat files and create root files
 +
 
 +
* Attempting solve issue on local machine instead of ISU property
 +
:* Copied daq2 to minerve then to local machine
 +
 
 +
* Ran power to work bench
 +
 
 +
* Brought 3D printer to lab
 +
 
 +
* HVAC updated research team, no AC in foreseeable future for clean room, so we get to continue to sweat
 +
 
 +
* John Longley has given interim permission for sources to be used to calibrate HPGe in clean room
 +
 
 +
* Attempted to build ROOT onto a new DAQ1 machine in hopes to skirt around issues with DAQ2
 +
 
 +
==8/4/21==
 +
 
 +
* ROOT built successfully on Daq1
  
* Need to talk to CoSE IT to get new DAQ computer and find out how to link into HPGe detector through switch in clean room
+
* DAQ1 & DAQ2 can now analyze data
 +
:* DAQ2 can also collect data
  
* Have CoSE IT mount second disk in new daq called (data) and give access to second partition on first disk
+
==8/24/21==
  
* Have CoSE IT swap MAC addresses for two daqs and give network access to hpge through browser and switch
+
* After a hiatus due to IT issues and a presentation, the HPGe detector is in the experimental setup
  
* New daq cannot find a valid base url for repo: base
+
=Future tasks not on meeting task list=
  
 
='''Go Back'''=
 
='''Go Back'''=

Latest revision as of 22:26, 24 August 2021

Timeline

This page will be used to document when each task is started/completed as a master reference for all work accomplished. The plan is to make my life easier when I have to look through months of work.

May

5/10/21

  • Attended intern orientation for first day at INL
  • Completed training this week as well as began NaI plateau setup

5/11/21

  • Put first coat of paint onto lead bricks to be used as shielding in PAS experiment

5/12/21

  • Moved steel table from LDS to clean room and began set up

5/17/21

  • Sheared a lead sheet into 6 rough 3"x3" squares to be used for attenuation measurements with NaI detectors
  • Lead sheet pieces were wiped down with a wet wipe, duct taped, rewiped, and hammered flat.

5/18/21

  • Began data collection for NaI plateau and operating point measurements
  • Began writing analysis code for NaI plateau measurements

5/27/21

  • Finished painting lead bricks and left to cure

Unknown time when tasks were completed

  • Gathered borated poly with Paul
  • Tested NaI detectors and found one working base

June

6/1/21

  • Moved dried/cured painted lead bricks from painting area to clean room
  • Cleaned each brick with a wet wipe before transition into clean room, will be allowed to air dry on steel table
    • 50 bricks total: 49 half bricks and 1 full brick
  • Steel table set up finished

6/4/21

  • Created initial lead brick tunnel

6/8/21

  • Finished collection and analysis of NaI detector plateau measurements, voltages ranging from 700V to 1400V
    • Analysis included Souce in & Source out plots, Signal:Noise, and background subtracted plots

6/9/21

  • Began data colleciton for He3 Borated Poly attenuation study

6/11/21

  • Finished data collection for He3 Borated Poly attenuation study
  • Began writing analysis code for Borated Poly attenuation study

6/21/21

  • Spent the day at INL with Chuting and Paul

6/22/21

  • Finished writing analysis code for He3 Borated Poly attenuation measurements and submitted plot to Paul
  • Began designing cradle for NaI detector using fusion360

6/24/21

  • Finished modeling cradle and sent designs to Jeff Burggraf who offered to print it for me

6/25/21

  • Began BorAl attenuation measurements including overnight background runs

6/26/21

  • First BorAl background run lasted 60000 seconds and ended at approximately 11:45am 6/26/21
  • Continuing to run Borated Poly attenuation measurements with BorAl surrounding He3 tube
  • Cradle for NaI detector has been printed and should be in lab Tuesday 6/29/21
  • Created github repository to advertise my poor coding practices
  • Began mapping shielding measurements for Lead, BorAl, and various Poly

6/28/21

  • Continued BorAl/Borated Poly attenuation measurements with He3 tube
  • Began working with MCNP
  • Continued to map out BorAl placement and shielding design for feasibility study
    • We need more BorAl

6/29/21

  • Finished BorAl/Borated Poly attenuation measurements
  • Got signal from HPGe detector
  • Discussed various poly box and shielding arrangements for feasibility study
    • Designs need to be drawn up
    • Lead tunnel needs to be made bigger to accommodate HPGe detector
      • Will probably need to model another cradle for HPGe
    • Need to source more regular poly and cut it to appropriate length and widths

6/30/21

  • Sourced regular poly and lead sheets, will be washed and brought to clean room today
  • Finalized design of poly box for feasibility study
    • Will have to cut some poly blocks to fit the needed dimensions
  • Finished designing poly brick thermalizing box and lead shielding
  • Brought poly down to LDS in dark room to be washed
  • Tony and Paul were able to get a good signal out of HPGe detector

Unknown time when tasks were completed

  • Found a fifth NaI detector (no base) with smaller crystal diameter (5.5cm)
  • Helped Tony and Joe moved DD generator from nuke eng department and subsequently lift into clean room
  • Moved HPGe detector into clean room and unpacked it, Paul has begun preliminary functionality testing

July

7/1/21

  • Installed cradle into lead tunnel
  • Discussed solid state physics with Dr. Forest regarding HPGe detector
  • Tested various arrangements to show that BorAl is most effective after borated poly and not before down beam axis
  • Received new daq from CoSE IT and Dr. Forest did preliminary setup

7/2/21

  • Finished and posted BorAl/BPoly/Poly attenuation measurement study
  • Redesigned thermalizing box with Paul
  • Created and posted BorAl shielded He3 attenuation measurements plot
  • Made and posted BorAl/Poly/Bpoly attenuation measurements plot

7/5/21

  • Fourth of July (observed)

7/6/21

  • Met with CoSE IT about DAQ issues
    • Need to upgrade DAQ to at least CENT OS 7, 8 may be better. Currently running version 6 which is too old for security updates
  • Worked with Paul on experimental setup design and marked some BorAl for cutting back at INL
  • Modeled experimental setup in fusion 360
    • Need more data from mcnp to finalize shielding designs
  • Drew cuts on BorAl for cutting

7/7/21

  • Washed regular poly for use in thermalizing cavity in experimental setup
  • Received new ADC and Gadolinium sheet from Chuting
  • Worked on MCNP and thermalizing box design with Paul
  • Gave some BorAl back to chuting to be cut

7/9/21

  • Downloaded new MCNP libraries to run Paul's new script
  • Spoke to Joe (chemist) about separating boron from BorAl and BPoly
  • Started working through python lessons
  • Started photon attenuation measurements in lead tunnel

7/12/21

  • Updated 3D model of feasibility study with Gadolinium converter and smoothed out some edges that were improperly situated
    • Next step is to model a cradle for He3 detector to be used in tunnel, then redesign for HPGe detector
  • Built experimental setup with Paul and attempted to get an energy spectrum through ADC

7/13/21

  • Compiled resources related to DAQ systems, specifically readout controller
  • Need to find a more reliable scope, may be one in LDS
  • Ran NaI through ADC and got energy spectrum. No calibration yet. Will update wiki later in week with fine details
    • Ran source out, source in, source in & Cadmium sheet
      • Noticeable changes in each

7/14/21

  • Adjusted thermalizing box design for easier source access
    • Took measurements of all poly needed
    • Preparing to cut poly to rebuild thermalizing box as designed
  • Designed cradle for He3 detector use in experimental setup
  • Continued python lessons
  • Emailed Josh Pak at ISU regarding chemical separations
  • Emailed Jack Bradley to get centos 7 disk
  • Did trial cuts on poly with Dr. Forest and found a method that gives accurate cuts

7/15/21

  • Continued fine tuning 3D design
  • Worked on more python lessons

7/16/21

  • Cut pieces of poly for thermalizing box
  • Built experimental setup
  • Discussed a run plan with Paul for next week
  • Created run plan for next week

7/19/21

  • Rendered images of experimental setup and uploaded to wiki page
  • Uploaded pictures taken of experimental setup
  • Finalized run plan for NaI and He3
  • Executed NaI run plan for preliminary measurements
  • Spoke to Roy Dunker about using Cs137, Co60, & Eu152 in clean room
  • Paperwork being filed with TSO

7/20/21

  • Executed He3 run plan for preliminary measurements
  • Met with Jeff Burggraf regarding ADC calibration and fixing NaI bases
  • Also spoke about using ADC and possible improvements

7/21/21

  • Ran both He3 and NaI with/without converter through ADC to create plots
  • Began disassembly of NaI bases to find issue
  • Both multimeters used were questionable, need 9V battery and fuses
  • Created plots of NaI and He3 measurements of past two days
  • Managed to copy files off of daq2 and onto minerve, cannot currently copy from minerve to local machine, had to rely on thumbstick
  • Cannot access root files easily without manual transfer before leaving ISU - will speak to CoSE IT about SCP issue
  • Have access to the source certificate for Cf252 source through Jeff Burggraf

7/22/21

  • Analyzed NaI and He3 energy spectrum data from ADC with Gd converter in/out
  • Presented data taken in experimental setup to INL collaborators
  • Discovered previously unknown artifact affecting data analysis on DAQ computer using various techniques including moving files to another machine for analysis and adjusting run parameters to give a known output. None were repeatable.

7/23/21

  • Continued to debug the DAQ system, most likely culprit is a bad RAM stick

7/26/21

  • Spoke with Tony regarding upgrading to new DAQ
  • Spoke with CoSE IT regarding upgrading to new DAQ
  • Started process of upgrading to new DAQ
  • First task is to get centos 7 up and running on a separate drive if possible. Currently the system cannot see the second disk through bios or centos 7 installer

7/27/21

  • Continued updating new DAQ
  • Mounted 1TB disk as storage for centos 7 under directory Data

7/28/21

  • Continued updating new DAQ, still

7/29/21

  • Continued updating new DAQ, even more
  • Planned rest of summer work with Paul regarding feasibility study

August

8/3/21

  • New DAQ has hit a wall with library issues not allowing evio2nt to parse dat files and create root files
  • Attempting solve issue on local machine instead of ISU property
  • Copied daq2 to minerve then to local machine
  • Ran power to work bench
  • Brought 3D printer to lab
  • HVAC updated research team, no AC in foreseeable future for clean room, so we get to continue to sweat
  • John Longley has given interim permission for sources to be used to calibrate HPGe in clean room
  • Attempted to build ROOT onto a new DAQ1 machine in hopes to skirt around issues with DAQ2

8/4/21

  • ROOT built successfully on Daq1
  • DAQ1 & DAQ2 can now analyze data
  • DAQ2 can also collect data

8/24/21

  • After a hiatus due to IT issues and a presentation, the HPGe detector is in the experimental setup

Future tasks not on meeting task list

Go Back


CH_Task_List

PAS_Experiment