Difference between revisions of "CH PAS Master Logbook"

From New IAC Wiki
Jump to navigation Jump to search
Line 6: Line 6:
 
! Run Number !! Detector Type !! Setup Description !! Start Time & Date !! End Time & Date !! RCGUI Events !! Plot
 
! Run Number !! Detector Type !! Setup Description !! Start Time & Date !! End Time & Date !! RCGUI Events !! Plot
 
|-
 
|-
|  ||  || || || ||  ||  
+
| 7031 || NaI || NaI detector 30cm from converter placement (Gd & Cf252 in) || 13:01:51 7/21/21 || 13:12:07 7/21/21 |||
 +
|-
 +
| 7033 || NaI || NaI detector in detector tunnel, 30cm from converter placement (Gd out, Cf252 in) || 13:17:30 7/21/21 || 13:27:27 ||  ||  
 +
|-
 +
| 7034 || He3 || He3 spanning length of detector tunnel (Gd out, Cf252 in) || 15:46:25 7/21/21 || 15:57:38 7/21/21 ||  ||  
 
|-
 
|-
| || || || || ||  ||  
+
| 7035 || He3 || He3 spanning length of detector tunnel (Gd in, Cf252 in) || 16:01:34 7/21/21 || 16:11:28 7/21/21 ||  ||  
 
|-
 
|-
 
|  ||  ||  ||  ||  ||  ||  
 
|  ||  ||  ||  ||  ||  ||  
Line 15: Line 19:
  
  
 
+
|  ||  ||  ||  ||  ||  ||
 
+
|-
7/21/21
 
 
 
* NaI with converter: Run 7031 -> Red
 
 
 
:* run start: 13:01:51
 
:* run stop: 13:12:07
 
 
 
* NaI without converter: Run 7033 -> Blue
 
:* Run 7032 failed 7 minutes in and was stopped by the computer
 
 
 
:* run start: 13:17:30
 
:* run stop: 13:27:27 or 13:37:27
 
 
 
He3 Runs
 
 
 
* He3 no converter: Run 7034 -> Blue
 
 
 
:* run start: 15:46:25
 
:* run stop: 15:57:38
 
 
 
* He3 with converter: Run 7035 ->  Red
 
 
 
:* run start: 16:01:34
 
:* run stop: 16:11:28
 
  
 
='''Ignore'''=
 
='''Ignore'''=

Revision as of 22:16, 23 August 2021

Every run I perform will eventually be logged here. If I don't have record of it here, then it's irrelevant

Run Table

Run Number Detector Type Setup Description Start Time & Date End Time & Date RCGUI Events Plot
7031 NaI NaI detector 30cm from converter placement (Gd & Cf252 in) 13:01:51 7/21/21 13:12:07 7/21/21
7033 NaI NaI detector in detector tunnel, 30cm from converter placement (Gd out, Cf252 in) 13:17:30 7/21/21 13:27:27
7034 He3 He3 spanning length of detector tunnel (Gd out, Cf252 in) 15:46:25 7/21/21 15:57:38 7/21/21
7035 He3 He3 spanning length of detector tunnel (Gd in, Cf252 in) 16:01:34 7/21/21 16:11:28 7/21/21


| || || || || || || |-

Ignore

Isotope Name Half Life Capture Gamma Lines (int > %)
Energy (KeV) Intensity



PAS Feasibility Study Runs