Difference between revisions of "PAS Feasibility Preliminary Runs"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
{| class="wikitable mw-collapsible mw-collapsed" border="2" style="text-align:center;" |cellpadding="20" cellspacing="1 | {| class="wikitable mw-collapsible mw-collapsed" border="2" style="text-align:center;" |cellpadding="20" cellspacing="1 | ||
− | ! Source Distance from Intersection (cm) !! Counts !! Run Time (s) !! Count Rate (Hz) !! Uncertainty | + | ! Source Distance from Intersection (cm) !! Counts !! Run Time (s) !! Count Rate (Hz) !! Uncertainty || |
|- | |- | ||
| 39.5 || || || || | | 39.5 || || || || |
Revision as of 19:35, 19 July 2021
This experimental setup does not contain BorAl
General run plan
- Run source in and source out in experimental setup and background subtract with NaI
- Move the source to different locations along the source tunnel and plot the different distances and count rates
- Run source in and source out in experimental setup and background subtract with He3
- Move the source to different locations along the source tunnel and plot the different distances and count rates
I will upload some models of the setup when I have updated the model to include the source and detector
7/19/21
Source Distance from Intersection (cm) | Counts | Run Time (s) | Count Rate (Hz) | Uncertainty | |
---|---|---|---|---|---|
39.5 | |||||