Difference between revisions of "PAS Feasibility Preliminary Runs"
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
=='''7/19/21'''== | =='''7/19/21'''== | ||
− | {| class="wikitable" | + | {| class="wikitable, center" |
|+ NaI Detector, 5mV threshold, +1000V on detector | |+ NaI Detector, 5mV threshold, +1000V on detector | ||
|- | |- |
Revision as of 19:34, 19 July 2021
This experimental setup does not contain BorAl
General run plan
- Run source in and source out in experimental setup and background subtract with NaI
- Move the source to different locations along the source tunnel and plot the different distances and count rates
- Run source in and source out in experimental setup and background subtract with He3
- Move the source to different locations along the source tunnel and plot the different distances and count rates
I will upload some models of the setup when I have updated the model to include the source and detector
7/19/21
Source Distance from Intersection (cm) | Counts | Run Time (s) | Count Rate (Hz) | Uncertainty |
---|---|---|---|---|
39.5 | ||||