Difference between revisions of "PAS Thermalizing Box Design"

From New IAC Wiki
Jump to navigation Jump to search
Line 58: Line 58:
  
 
=Lead=
 
=Lead=
 
* 4" x 1" x 8" (x12)
 
** The lead is layered beneath, around the outside, and on top of the thermalizing box
 
 
The lead base is 4 bricks
 
 
The outside is covered by 5 bricks (on 1" x 4" side (upright))
 
 
The top is covered by 3 bricks
 
  
 
=BorAl=
 
=BorAl=

Revision as of 18:08, 14 July 2021

3D Models

For all models:

  • Red - Lead brick
  • White - Regular poly
  • Green - Borated Poly


7/6/21

Render of top down view of preliminary experimental setup


This design is preliminary and subject to change. No BorAl shielding has been included.

7/12/21

CH PAS Pb tunnel v21 Gd Converter.png

CH PAS Pb Tunnel v21.png

7/14/21

Poly Bricks for Setup

Poly Base

  • 4X (4" x 2" x 6")
  • 2X (4" x 2" x 7")

Poly Outside Wall

  • 1X (4" x 2" x 7")
  • 1X (4" x 2" x 6")
  • 2X (4" x 2" x 8")

Poly Inside Wall

  • 1X (4" x 2" x 3")
  • 1X (4" x 2" x 8")
  • 2X (4" x 2" x 6")

Poly Top

  • 2X (4" x 2" x 7")
  • 3X (4" x 2" x 6")
  • 2X (2" x 2" x 6")

Lead

BorAl


PAS_Experimental_Setup