+ | ==7/14/21== | ||
+ | |||
+ | '''Poly Bricks for Setup''' | ||
+ | |||
+ | ===Poly Base=== | ||
+ | |||
+ | * 4X (4" x 2" x 6") | ||
+ | |||
+ | * 2X (4" x 2" x 7") | ||
+ | |||
+ | ===Poly Outside Wall=== | ||
+ | |||
+ | * 1X (4" x 2" x 7") | ||
+ | |||
+ | * 1X (4" x 2" x 6") | ||
+ | |||
+ | * 2X (4" x 2" x 8") | ||
+ | |||
+ | ===Poly Inside Wall=== | ||
+ | |||
+ | * 1X (4" x 2" x 3") | ||
+ | |||
+ | * 1X (4" x 2" x 8") | ||
+ | |||
+ | * 2X (4" x 2" x 6") | ||
+ | |||
+ | ===Poly Top=== | ||
+ | |||
+ | * 2X (4" x 2" x 7") | ||
+ | |||
+ | * 3X (4" x 2" x 6") | ||
+ | |||
+ | * 2X (2" x 2" x 6") | ||
=Poly= | =Poly= |
Revision as of 18:07, 14 July 2021
3D Models
For all models:
- Red - Lead brick
- White - Regular poly
- Green - Borated Poly
7/6/21
This design is preliminary and subject to change. No BorAl shielding has been included.
7/12/21
7/14/21
Poly Bricks for Setup
Poly Base
- 4X (4" x 2" x 6")
- 2X (4" x 2" x 7")
Poly Outside Wall
- 1X (4" x 2" x 7")
- 1X (4" x 2" x 6")
- 2X (4" x 2" x 8")
Poly Inside Wall
- 1X (4" x 2" x 3")
- 1X (4" x 2" x 8")
- 2X (4" x 2" x 6")
Poly Top
- 2X (4" x 2" x 7")
- 3X (4" x 2" x 6")
- 2X (2" x 2" x 6")
Poly
Sizes needed for thermalizing box
- 2" x 6.75" x 4"
- 2" x 8" x 4"
- 2" x 4" x 4"
- 1.75" x 4" x 8"
- 12" x 2" x 7"
- These are the base and roof plates
These are now all wrong and will need to be redesigned
Lead
- 4" x 1" x 8" (x12)
- The lead is layered beneath, around the outside, and on top of the thermalizing box
The lead base is 4 bricks
The outside is covered by 5 bricks (on 1" x 4" side (upright))
The top is covered by 3 bricks