Difference between revisions of "CH Task List"
Jump to navigation
Jump to search
Line 60: | Line 60: | ||
* Start mcnp simulations | * Start mcnp simulations | ||
** Find level of boron doping in poly through simulations | ** Find level of boron doping in poly through simulations | ||
− | |||
* Print NaI cradle (X) | * Print NaI cradle (X) | ||
Line 76: | Line 75: | ||
** Repeat of previous attenuation measurements with borated poly, just with detector surrounded by BorAl instead, do again with nonborated poly | ** Repeat of previous attenuation measurements with borated poly, just with detector surrounded by BorAl instead, do again with nonborated poly | ||
− | * Rebuild computer with updated operating system and rebuilt with newest version of root | + | * Rebuild computer with updated operating system and rebuilt with newest version of root (X) |
* Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector | * Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector |
Revision as of 18:16, 26 June 2021
Notes from biweekly meetings
5/27/21
To Do List
- Add dual timer configuration to plateau page (X)
- Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots (X)
- Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github)
- NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead
- Begin experimental setup in clean room (X)
- Test HPGe detector -> Work has begun on this by a colleague
- Complete latest assigned training module (X)
- Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
- Move painted lead bricks to clean room (X)
- Linked manual for HPGe detector to wiki pages (X)
- Add files sent by collaborator on HPGe detector page
- Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X)
- Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X)
- Finish 1100V source out data collection (X)
- Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list
- Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X)
- Create wiki page for DD generator page
- Include shielding papers and manuals -> will talk to Joe about this
- Paul got his tape measure unstuck from the clean room (X)
- We're all very proud of him
6/10/21
To Do List
- Finish attenuation measurements (X) and data analysis for He3 detector (X)
- Virgin poly (X)
- Continue experimental set up (X)
- Model cradle for NaI detector for lead tube (X)
- Talk to Roy Dunker about HPGe software (X)
- Have CDs for the software, colleague will attempt to get it working
6/24/21
To Do List
- Start mcnp simulations
- Find level of boron doping in poly through simulations
- Print NaI cradle (X)
- Cradle is printed, need to pick up
- Photon attenuation measurements for lead with NaI
- Start with sheets, then go to one or two bricks
- boral around all sides and make exit with lead bricks
- Start with sheets, then go to one or two bricks
- BorAl attenuation measurements for neutrons with He3
- Thermalizing box, with and without an extra sheet of poly between source and detector
- Green borated poly and regular poly
- Thermalizing box, with and without an extra sheet of poly between source and detector
- Neutron attenuation through 360 degree coverage of He3 with BorAl, plus borated poly
- Repeat of previous attenuation measurements with borated poly, just with detector surrounded by BorAl instead, do again with nonborated poly
- Rebuild computer with updated operating system and rebuilt with newest version of root (X)
- Arrange meeting with Jeff Burggraf regarding usage of HPGe detector as he has previously used this exact detector
- (if time) Measure background with He3 and NaI in shielded tunnel for experimental setup