Difference between revisions of "CH PAS Master Timeline"
Jump to navigation
Jump to search
(→June) |
|||
Line 16: | Line 16: | ||
=June= | =June= | ||
+ | |||
+ | ==6/8/21== | ||
+ | |||
+ | * Finished collection and analysis of NaI detector plateau measurements | ||
==6/9/21== | ==6/9/21== |
Revision as of 23:52, 25 June 2021
Timeline
This page will be used to document when each task is completed as a master reference for all work logged in the wiki. The plan is to make things easier when I need to pull things in the future.
May
5/10/21
- Attended intern orientation for first day at INL
- Completed training this week as well as began NaI plateau setup
5/18/21
- Began data collection for NaI plateau and operating point measurements
June
6/8/21
- Finished collection and analysis of NaI detector plateau measurements
6/9/21
- Began data colleciton for He3 Borated Poly attenuation study
6/11/21
- Finished data collection for He3 Borated Poly attenuation study
- Began writing analysis code for Borated Poly attenuation study
6/22/21
- Finished writing analysis code for He3 Borated Poly attenuation measurements and submitted plot to Paul
6/25/21
- Began BorAl attenuation measurements including overnight background runs