Difference between revisions of "CH Task List"

From New IAC Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
==5/27/21==
 
==5/27/21==
  
===To do list===
+
'''To Do List'''
  
 
* Add dual timer configuration to plateau page (X)
 
* Add dual timer configuration to plateau page (X)
Line 10: Line 10:
 
** Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github)  
 
** Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github)  
  
* NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
+
* NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead
  
 
* Begin experimental setup in clean room (X)
 
* Begin experimental setup in clean room (X)
Line 26: Line 26:
  
 
* Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X)
 
* Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X)
** Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this  
+
** Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X)
  
 
* Finish 1100V source out data collection (X)
 
* Finish 1100V source out data collection (X)
 +
 +
* Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list
 +
 +
* Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X)
 +
 +
* Create wiki page for DD generator page
 +
** Include shielding papers and manuals -> will talk to Joe about this
 +
 +
* Paul got his tape measure unstuck from the clean room (X)
 +
** We're all very proud of him
 +
 +
==6/10/21==
 +
 +
'''To Do List'''
 +
 +
* Finish attenuation measurements (X) and data analysis for He3 detector
 +
** Virgin poly (X)
 +
 +
* Continue experimental set up
 +
 +
* Model cradle for NaI detector for lead tube
 +
 +
* Talk to Roy Dunker about HPGe software (X)
 +
** Have CDs for the software, colleague will attempt to get it working
  
 
* Rebuild computer with updated operating system and rebuilt with newest version of root
 
* Rebuild computer with updated operating system and rebuilt with newest version of root
  
* Run 950V plateau data due to discontinuity in data sets 1000V & 1050V
+
* Start MCNP simulations
 +
 
 +
 
 +
 
  
* Create wiki page for DD generator page
 
** Include shielding papers and manuals
 
  
 
----
 
----
 
[[PAS_Experiment]]
 
[[PAS_Experiment]]

Revision as of 18:01, 22 June 2021

Notes from biweekly meetings

5/27/21

To Do List

  • Add dual timer configuration to plateau page (X)
  • Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots (X)
    • Overhauled analysis code throughout the week of 6/1/21 to calculate all rates, uncertainties, background subtractions, and signal to noise ratios. Code now generates 3 plots with all errors included -> I need to create a code repository (could use github)
  • NaI attenuation measurements (with BorAl and try different types of poly (unborated, purple, green)) -> working with He3 instead
  • Begin experimental setup in clean room (X)
  • Test HPGe detector -> Work has begun on this by a colleague
  • Complete latest assigned training module (X)
  • Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
  • Move painted lead bricks to clean room (X)
  • Linked manual for HPGe detector to wiki pages (X)
    • Add files sent by collaborator on HPGe detector page
  • Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify. (X)
    • Verified that there is a 3x drop in Hz between 135mV-155mV threshold level at 1000V. Unsure what could cause this (X)
  • Finish 1100V source out data collection (X)
  • Rebuild computer with updated operating system and rebuilt with newest version of root -> moved to next list
  • Run 950V plateau data due to discontinuity in data sets 1000V & 1050V (X)
  • Create wiki page for DD generator page
    • Include shielding papers and manuals -> will talk to Joe about this
  • Paul got his tape measure unstuck from the clean room (X)
    • We're all very proud of him

6/10/21

To Do List

  • Finish attenuation measurements (X) and data analysis for He3 detector
    • Virgin poly (X)
  • Continue experimental set up
  • Model cradle for NaI detector for lead tube
  • Talk to Roy Dunker about HPGe software (X)
    • Have CDs for the software, colleague will attempt to get it working
  • Rebuild computer with updated operating system and rebuilt with newest version of root
  • Start MCNP simulations