Difference between revisions of "NaI JD-766 Attenuation"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
[[File:Unshielded_NaI_JD-766.jpg|300px|thumb|left|Detector JD-766 on experimental table to measure background count rate to be used in attenuation measurements.]] | [[File:Unshielded_NaI_JD-766.jpg|300px|thumb|left|Detector JD-766 on experimental table to measure background count rate to be used in attenuation measurements.]] | ||
− | + | {| border="1" |cellpadding="20" cellspacing="0 | |
+ | |- | ||
+ | | Run Number || configuration | ||
+ | |- | ||
+ | | 6819 || Cs-137 source at location of Cf-252, no Cf-252 or Cd target in apparatus | ||
+ | |- | ||
+ | | 6820 || start time: 16:04:33 04/26/2021 Cs-137 out, Cd in , Cf-252 out. NaI at closest possible. stop time: 16:08:34 (241 seconds) | ||
+ | |- | ||
+ | | 6821 || start time: 16:11:49 04/26/2021 Cs-137 out, Cd in , Cf-252 in , Poly thermalizer 1/2" in. NaI at closest possible. stop time: 16:22:52 (663 sec) | ||
+ | |- | ||
+ | | 6822 || start time: 16:23:54 04/26/2021 Cs-137 out, Cd in , Cf-252 out , Poly thermalizer 1/2" in. NaI at closest possible. stop time:16:34:38 (673 sec) | ||
+ | |- | ||
+ | | 6823 || start time: 16:35:44 04/26/2021 Cs-137 out, Cd out , Cf-252 out , Poly thermalizer 1/2" in. NaI at closest possible. stop time:16:46 | ||
+ | |- | ||
+ | | 6824 || start time: 16:35:44 04/26/2021 Cf-252 in , Poly thermalizer 1/2" in. ,Cd in sandwhich , NaI at closest possible. stop time:16:46 | ||
+ | |- | ||
+ | | 6825 || start time: 16:53:55 04/26/2021 Cf-252 in 6 in away, 1" lead, , Poly thermalizer 1/2" in. ,Cd in sandwhich , NaI at closest possible. stop time:16:54:58 | ||
+ | |- | ||
+ | | 6826 || start time: 16:57:39 04/26/2021 Cf-252 in 6 in away, 2" lead, , Poly thermalizer 1/2" in. ,Cd in sandwhich , NaI at closest possible. stop time:16:58:49 | ||
+ | |- | ||
+ | | 6827 || start time: 16:59:13 04/26/2021 Cf-252 in 6 in away, 2" lead, , Poly thermalizer 1/2" in. ,Cd OUT sandwhich , NaI at closest possible. stop time:17:00:15 | ||
+ | |- | ||
+ | |} | ||
Revision as of 19:36, 14 May 2021
Preliminary Measurements
Run Number | configuration |
6819 | Cs-137 source at location of Cf-252, no Cf-252 or Cd target in apparatus |
6820 | start time: 16:04:33 04/26/2021 Cs-137 out, Cd in , Cf-252 out. NaI at closest possible. stop time: 16:08:34 (241 seconds) |
6821 | start time: 16:11:49 04/26/2021 Cs-137 out, Cd in , Cf-252 in , Poly thermalizer 1/2" in. NaI at closest possible. stop time: 16:22:52 (663 sec) |
6822 | start time: 16:23:54 04/26/2021 Cs-137 out, Cd in , Cf-252 out , Poly thermalizer 1/2" in. NaI at closest possible. stop time:16:34:38 (673 sec) |
6823 | start time: 16:35:44 04/26/2021 Cs-137 out, Cd out , Cf-252 out , Poly thermalizer 1/2" in. NaI at closest possible. stop time:16:46 |
6824 | start time: 16:35:44 04/26/2021 Cf-252 in , Poly thermalizer 1/2" in. ,Cd in sandwhich , NaI at closest possible. stop time:16:46 |
6825 | start time: 16:53:55 04/26/2021 Cf-252 in 6 in away, 1" lead, , Poly thermalizer 1/2" in. ,Cd in sandwhich , NaI at closest possible. stop time:16:54:58 |
6826 | start time: 16:57:39 04/26/2021 Cf-252 in 6 in away, 2" lead, , Poly thermalizer 1/2" in. ,Cd in sandwhich , NaI at closest possible. stop time:16:58:49 |
6827 | start time: 16:59:13 04/26/2021 Cf-252 in 6 in away, 2" lead, , Poly thermalizer 1/2" in. ,Cd OUT sandwhich , NaI at closest possible. stop time:17:00:15 |