Documentation of building of the UNCL in physics basement
Week of May 25th 2020
Week of June 1st 2020
Progress
Started detector plateau measurements on July 22nd 2020 - Link spreadsheet later
Rack fully built for most part - Able to access high voltage power supply from daq
Beginning of understanding of the electronics required for data collection
Requisitions
DAQ
Startup CODA programs in separate xterminal sessions
type the following to setup the CODA environmental variables in every xterm
source CODA/2.6.2/setup
start up msqld, et_start, rcplatform in separate xterms.
(do the following two commands in a csh & separate xterms)
coda_eb_rc3 -i -s DAQ -n eb1 -t CDEB
coda_er_rc3 -i -s DAQ -n LDS_ER -t ER
login to the ROC (rocdaq1) and start the process
ssh root@rocdaq1
csh
source CODA/2.6.2/setup
coda_roc_rc3 -t ROC -n rocdaq1
now startup the runcontrol GUI
rcgui
do the following menu calls in rcgui
Configuration->Cool
select "sis3610" or "iac2n"
click the Configure button (wrench & screwdriver icon on upper left)
click the download button (floppy disk icon)
click "Prestart" and then "Go" buttons
UNCL Runs
Run 6705
Date: 8/10/2020
Start time: 18:19:32
Stop time: 18:57:21
Source in, 54 cm from neutron UNCL 2
Total Events: 5987
9" sep between photon scintillators