Difference between revisions of "First Board for Beam Profile"

From New IAC Wiki
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
<center>
+
[[File:Board_1.JPG|400px|thumb|left|Board is separated into two inch squares with mounts for an OSL at each intersection, allowing for a total of 169 OSLs to be fitted per run]]
  
[[File:Board_1.JPG|400px|thumb|left|Board is separated into two inch squares with mounts for an OSL at each intersection, allowing for a total of 169 OSLs to be fitted per run]][[File:Board_1_close_up.jpg|400px|thumb|center|Close up of the mounting nails and center of the board. Nails are positioned such that the center of the OSL is on the intersection, allowing for easy symmetry]]
+
[[File:Board_1_close_up.jpg|400px|thumb|center|Close up of the mounting nails and center of the board. Nails are positioned such that the center of the OSL is on the intersection, allowing for easy symmetry]]
  
  
</center>
+
[[File:Holes_drilled.JPG|400px|thumb|left|Holes are drilled into the board to allow dose sticks to be attached to the back of the board]]
  
 +
[[File:96cm_First_Run_OSLs_Loaded.JPG|400px|thumb|center|OSLs loaded for the first run to determine beam profile]]
 +
 +
[[File:Measured_Distance_from_Beam_End.JPG|400px|thumb|left|Distance from the beam end to the board]]
 +
 +
 +
[[File:Fully_Loaded_Array_for_50cm_Shot.JPG|400px|thumb|center|Board fully loaded and prepared to be mounted in front of accelerator]]
 +
 +
 +
[[File:Mounted_Array_for_50cm_Shot.JPG|400px|thumb|left|Fully loaded array at 50cm. Full array holds 191 OSLs]]
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
----
 +
 +
[[Thesis]]
  
 
[[HC_TriMeV]]
 
[[HC_TriMeV]]

Latest revision as of 19:55, 31 October 2017

Board is separated into two inch squares with mounts for an OSL at each intersection, allowing for a total of 169 OSLs to be fitted per run
Close up of the mounting nails and center of the board. Nails are positioned such that the center of the OSL is on the intersection, allowing for easy symmetry


Holes are drilled into the board to allow dose sticks to be attached to the back of the board
OSLs loaded for the first run to determine beam profile
Distance from the beam end to the board


Board fully loaded and prepared to be mounted in front of accelerator


Fully loaded array at 50cm. Full array holds 191 OSLs

























Thesis

HC_TriMeV