Difference between revisions of "2015 NSF Proposal"

From New IAC Wiki
Jump to navigation Jump to search
Line 15: Line 15:
 
Mention how construction of R1 illustrates the groups level of investment in Hall B's physics research program.  The group's involvement will continue by training students in the calibration  
 
Mention how construction of R1 illustrates the groups level of investment in Hall B's physics research program.  The group's involvement will continue by training students in the calibration  
 
of the CLAS12 drift chambers.  Olga Cortez has already been contributing in this manner.
 
of the CLAS12 drift chambers.  Olga Cortez has already been contributing in this manner.
 +
 +
 +
=Annual Project Report=
 +
 +
==June 2017==
 +
 +
 +
 +
 +
Reviewed NSF proposal.
 +
  
  
 
[[NSF]]
 
[[NSF]]

Revision as of 19:01, 3 June 2017

Proposal Due

November 13, 2015

http://www.nsf.gov/pubs/2015/nsf15579/nsf15579.htm


000416256



CLAS12 Detector.jpgEG12 TRGT 6-5-2015.png


Mention how construction of R1 illustrates the groups level of investment in Hall B's physics research program. The group's involvement will continue by training students in the calibration of the CLAS12 drift chambers. Olga Cortez has already been contributing in this manner.


Annual Project Report

June 2017

Reviewed NSF proposal.


NSF