Difference between revisions of "LB May 2017 Irradiation Day"

From New IAC Wiki
Jump to navigation Jump to search
Line 23: Line 23:
 
Timer to Start Counting:
 
Timer to Start Counting:
  
Timing Cut Information for 50% Se Run (based on Det B time)
+
==Timing Cut Information for 50% Se Run (based on Det B time)==
 +
 
 +
50%SeSoil_DetB_OuterSe_DetA_pos10.mpa
 +
 
 +
50% Soil Se: Start: 0  Stop: 500 s
 +
Co-60 Flag : Start : 500s Stop : 600s
 +
Outer Se : Start 602s Stop: 1000s
 +
Co-60 Flag : Start
 +
 
  
 
32 MeV Beam 50 mA  current 180Hz 2.2 us
 
32 MeV Beam 50 mA  current 180Hz 2.2 us

Revision as of 15:54, 23 May 2017

DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


5/23/17

32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA

50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17 50%Se-Soil DetB Outer Se Det A 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa 09:43:36 23.6cm (DetB) pos10 (DetA)

Beam On:08:48 AM

Beam Off:

Timer to Start Counting:

Timing Cut Information for 50% Se Run (based on Det B time)

50%SeSoil_DetB_OuterSe_DetA_pos10.mpa

50% Soil Se: Start: 0 Stop: 500 s Co-60 Flag : Start : 500s Stop : 600s Outer Se : Start 602s Stop: 1000s Co-60 Flag : Start


32 MeV Beam 50 mA current 180Hz 2.2 us