Difference between revisions of "LB May 2017 Irradiation Day"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 1: | Line 1: | ||
| − | |||
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482  | DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482  | ||
| Line 7: | Line 6: | ||
=5/23/17=  | =5/23/17=  | ||
| − | 32 MeV Beam 50 mA  current    | + | 32 MeV Beam 50 mA  current after 7 minutes current came up to 80 mA  | 
==50% Se Soil Mix==  | ==50% Se Soil Mix==  | ||
Revision as of 14:55, 23 May 2017
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
5/23/17
32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA
50% Se Soil Mix
| Date | Sample | Document Title | Start | Stop | Runtime (s) | Position | 
| 5/23/17 | 
Beam On:08:48 AM
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)
32 MeV Beam 50 mA current 180Hz 2.2 us